| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-AOC EAST KAJORA COLLIERY PO DAKSHIN KHANDA BARDHAMAN 713338 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹8.8 L | 1 | Accepted-AOC Accepted as L-1 bidder, all the document submitted and accepted. |
| 2 | Rejected-Technical WARD NO 03 JAMUNA COLLIERY DISTT ANUPPUR MP 484444 | ANUPPUR | MADHYA PRADESH | 484444 | - | - | Rejected-Technical L-3 Bidder, Tech Evaluation not done. |
| 3 | Rejected-Technical | - | - | Rejected-Technical L-5 Bidder, Tech Evaluation not done. |
| 4 | Rejected-Technical | - | - | Rejected-Technical L-4 Bidder, Tech Evaluation not done. |
| 5 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | - | Rejected-Technical L-2 Bidder, Tech Evaluation not done. |
Tender Value
₹22.1 L
EMD Value
₹27,700
Closing Date
31 Oct 2022, 5:00 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444,
Proposal for the works of dismantling, loading, unloading, transporting and staking of electrical and mechanical equipment from 74LW panel and appliances to 45D/47LW proposed development panel of LK II Seam in Bartarai Colliery, Amadand UG Sub Area.
2022_SECL_259869_1
SECL/JK/GM(O)/22-23/eT/30 Date 19.10.2022
Open Tender
Miscellaneous Works
Item Rate
120 days
Bartarai Colliery, Amadand UG Sub Area, JK Area
As per NIT
3 documents required · 3 mandatory
₹27,700
17 Feb 2023
19 Oct 2022
1 Nov 2022
19 Oct 2022
31 Oct 2022
20 Oct 2022
19 Oct 2022 - 24 Oct 2022
Amount
Dismantling and transportation of 800 mm PVC belting of 74 LW panel LKll seam from +1D/48LW to +1D/74LW = 760 meter and 74LW/+1D to 74LW 48D(1300meter), total 2060 meter to the end of track line of bartarai Colliery
Dismantling and transportation of 01 nos of 800 mm size, single drive drum/drive head without loop take up of pony belt conveyors of 74 LW panel without loop take up to the track and with a lead of 100 meters at Bartarai Colliery.
Dismantling of 2060 meter belt structure of of 800 mm PVC belting and transportation of same upto the end of the track line at a lead of 100 meters in Underground at 74 LW panel LKll seam at bartarai Colliery (from +1D/48LW to +1D/74LW = 760 meter and 74LW/+1D to 74LW /48D(1300meter), total 2060 meter)
Dismantling of haulage track line 1200 mater x2=2400 rail of 30LBS of 64LW Panel, LK-ll seam , Bartarai Colliery.
Dismantling and transportation of Power Cable, Telephone Cable and signalling wire of 64LW panel to end of haulage track line in LK-ll seam, bartarai Colliery
Power Cable 50sqmm
Siganalling Wire
Telephone Cable
Dismantling and transportation of Electrical Equipments of 74LW Panel, LK-ll seam to the end of the track line
Transformer 3.3 KV, 315 KVA
Drill Panel
VCB3.3 KV, 100 A
ACB, 550V, 300A, 200A
Starter, 550V
Electric Motors, 50HP
Electric Motors, 120HP
Total impact of GST for the purpose of CTC
Ram Awadh Singh
DWIVEDI TRADERS
NAVIN KUMAR
MAHENDRA SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .