Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 CrAccepted-AOC N A | PALWAL | HARYANA | 121004 | ₹2.0 Cr | L-1 | Accepted-AOC l-1 |
| 2 | L-2₹2.4 Cr+₹39.2 L (19.6%)Rejected-Finance 101 PRIDE KUMAR SENATE BUILDING SENAPATI BAPAT ROAD SENAPATI BAPAT ROAD PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | ₹2.4 Cr+₹39.2 L (19.6%) | L-2 | Rejected-Finance Other than L-1 bidder |
| 3 | L-3₹3.0 Cr+₹97.7 L (48.9%)Rejected-Finance 121004 | ₹3.0 Cr+₹97.7 L (48.9%) | L-3 | Rejected-Finance Other than L-1 bidder |
Tender Value
Refer Docs
Closing Date
3 Jan 2022, 2:00 pmClosed
DGM(Mat)
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, Noida (UP) 201 301, India
Booster pumping units ,VS-6 type as per API 610
2021_PLHO_143158_2
PLM/SMPL-AUGJ18/21/20
Open Tender
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
330 days
Noida
As per tender document
16 documents required · 16 mandatory
Exempted
On virtual mode
28 Apr 2022
5 Nov 2021
4 Jan 2022
5 Nov 2021
3 Jan 2022
25 Nov 2021
10 Nov 2021
Amount
ITEM SUPPLY
Vertical Turbine type Centrifugal Pumping Unit complete with Pump (VS6 of API610), Counter Flanges , eccentric reducer, Concentric reducer ,Y-Strainer, Coupling, Base plate, Flameproof and weatherproof squirrel cage induction motor, Instrumentation and with all accessories & commissioning spares as per technical specifications (Pump parameters-Q-500 M3 /Hrs,H-120 MCL)
Complete Mechanical Seal as per technical specifications
Pump Bearing as per technical specifications
Complete set of pump gaskets/O-ring as per technical specifications
Motor Bearing (DE+NDE) as per technical specifications
Cooling Fan as per technical specifications
Pump Bearing RTD as per technical specifications
Pump Casing RTD as per technical specifications
Vibration Switch for pump as per technical specifications
Pressure Switch (complete with Junction box) for suction as per technical specifications
Pressure Switch (complete with Junction box) for discharge as per technical specifications
Pressure Indicator for suction as per technical specifications
Pressure Indicator for discharge as per technical specifications
Limit Switch/Transmitter for seal leakage detector as per technical specifications
Vibration switch for motor (if applicable) as per technical specifications
Service charges for pre-commissioning check, installation & commissioning personnel including all expenses e.g. Air/Rail Fare, Local Transport, accommodation etc. for pumping unit (@ 10 days per pumping units). Location-haldia
KIRLOSKAR EBARA PUMPS LIMITED
Sulzer Pumps India Private Limited
KIRLOSKAR EBARA PUMPS LIMITED
Sulzer Pumps India Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .