| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹86.9 L+₹1.4 L (1.63%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹94.1 L+₹8.6 L (10.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹97.5 L+₹12.1 L (14.1%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹99.1 L+₹13.6 L (15.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUSANTA KUMAR SWAIN L2 | Gyana Ranjan Mohanty L4 | Aakar Infra Engineers PVT Ltd L7 | M/S BHAIRAB CHARAN SWAIN L3 | SUBRAT KUMAR BEHURA L6 | M/s. P N Construction L1 | Skater Infratech India Pvt. Ltd. L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing structures like damaged RCC wall and other structure comprising of masonry, cement concrete of diferent grades, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of dismantled material with all lifts and lead of 1000 metres including all labour, machinaries, fuel, tools, hire and running charges of all machineries and equipment, transportation, gate entry fees, taxes but excluding GST etc. all complete as directed by Engineer-In-Charge. N.B.: Steel scraps, pipes etc. if any found during dismantling need to be returned to PPT Central Store. | 251.37 | Each Cubic Meter | 1,350 ₹3,39,349.5 | 250 ₹62,842.5 | 750 ₹1,88,527.5 | 65 ₹16,339.05 | 2,000 ₹5,02,740 | 40 ₹10,054.8 Lowest | 50 ₹12,568.5 |
| 2.00 | Earthwork in excavation for all kinds of soils for foundation including setting out, dressing of sides, ramming of bottom, stacking the excavated material for refilling and disposal of surplus soil upto a lead of 5.0 km including all lift including all labour, material, T&P, fuels, gate entry fees, taxes but excluding GST etc. all complete as directed by Engineer in-Charge. | 1,031.76 | Each Cubic Meter | 130 ₹1,34,128.8 | 40 ₹41,270.4 Lowest | 100 ₹1,03,176 | 40 ₹41,270.4 Lowest | 120 ₹1,23,811.2 | 50 ₹51,588 | 120 ₹1,23,811.2 |
| 3.00 | Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagment, hire & running charges of Pump, transportation charges, tollage, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required). | 120 | Each Hour | 100 ₹12,000 | 30 ₹3,600 | 700 ₹84,000 | 25 ₹3,000 | 30 ₹3,600 | 10 ₹1,200 Lowest | 10 ₹1,200 Lowest |
| 4.00 | Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 cement: 3 Coarse aggregate : 6 hard granite graded chips of 20mm & below size Crusher Broken) for PCC mixed in a Mixer Machine/ Batching Plant, hoisting, laying over compacted surface, finished smooth to the exposed surface, compacting by rammer as directed, to proper level & gradient,barricading the work site, curing etc with supply of all materials, labour, engagement, hire & running charges of all machineries, transportation charges, Port entry fees, T&P and taxes excluding GST etc. all complete as directed by the Engineer-in-charge. | 98.6 | Each Cubic Meter | 5,900 ₹5,81,740 | 3,000 ₹2,95,800 | 5,200 ₹5,12,720 | 3,740 ₹3,68,764 | 3,500 ₹3,45,100 | 2,500 ₹2,46,500 | 1,010 ₹99,586 Lowest |
| 5.00 | Reinforced Cement concrete of M-20 grade by using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for R.C.C work, mixing in a Batching Plant of suitable capacity, transporting the concrete by any approved means, hoisting, laying, compacting by niddle vibrator of approved capacity, finished smooth to the exposed surface to proper grade and camber, texturing the top surface with brooming with wire brush, curing including the cost of water, barricading the area if required etc. with supply of all materials, labour, T&P, Port entry fees, royalty, tollage, all transportation charges, all testing charges including cost for design mix, engagement, hire & running charges of all machineries etc. taxes excluding GST all complete as directed by Engineer in charge. [N.B:- (i)Two separate Mix Design shall be conducted with different Cement brand for RCC work, (ii) cost excluding cost of Reinforcement, bending/ binding charges, cost of binding wire and centering, shuttering. (iii) Provision of Batching Plant is essential (movebale is also acceptable]. | 766.23 | Each Cubic Meter | 7,480 ₹57,31,400.4 | 4,200 ₹32,18,166 | 6,500 ₹49,80,495 | 5,210 ₹39,92,058.3 | 5,000 ₹38,31,150 | 4,000 ₹30,64,920 Lowest | 4,710 ₹36,08,943.3 |
| 6.00Providing rigid, smooth leak proof Centering & shuttering for form works made out of good quality new ply/ steel shutters for raft,pavement slab,wall or any other structure as and where required, providing openings of specified size on wall, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including staging/ scaffolding with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, Port entry fees, taxes but excluding GST etc. all complete as directed by the Engineer-in-charge. | ||||||||||
| 6.10 | Foundation | 431.76 | Each Square Meter | 270 ₹1,16,575.2 | 65 ₹28,064.4 | 380 ₹1,64,068.8 | 105 ₹45,334.8 | 100 ₹43,176 | 60 ₹25,905.6 | 45 ₹19,429.2 Lowest |
| 6.20 | RCC Wall | 3,210.4 | Each Square Meter | 390 ₹12,52,056 | 250 ₹8,02,600 | 400 ₹12,84,160 | 105 ₹3,37,092 Lowest | 250 ₹8,02,600 | 140 ₹4,49,456 | 182 ₹5,84,292.8 |
| 6.30 | Slab | 108 | Each Square Meter | 590 ₹63,720 | 260 ₹28,080 | 550 ₹59,400 | 100 ₹10,800 | 150 ₹16,200 | 50 ₹5,400 Lowest | 80 ₹8,640 |
| 7.00 | Supply of Fe-500 grade steel confirming to I.S. Specifications of SAIL/ RINL/ TISCON including cutting, straightening, bending, binding with binding wire of 18 to 20 gauge & placing the grills in position for RCC works including supply of all materials, labour, T&P, tollage, Port entry fees, execluding GST etc. all complete as directed by the Engineer-in-charge. (N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.) | 919.48 | Each Quintal | 69 ₹63,443.84 Lowest | 5,600 ₹51,49,065.6 | 8,200 ₹75,39,703.2 | 4,935 ₹45,37,614.06 | 6,500 ₹59,76,594 | 5,000 ₹45,97,380 | 5,900 ₹54,24,908.4 |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
14 Jun 2021, 5:00 pmClosed
N Patro ,EE, HWD-II,PPT
Office of the Harbour Works Division No.II, Engineering Department, Paradip Port Trust, First Floor, Administrative Building, Tele -06722-223001 Mob-9556898061
Repair and renovation of drain at Siding Plot S-3 inside Port premises.
2021_MoS_630947_1
CE/HW-II-W-24/20/138
Open Tender
Civil Works
Works
240 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD.
₹2.2 L
Yes
13 Jul 2021
24 May 2021
16 Jun 2021
24 May 2021
14 Jun 2021
24 May 2021
Amount
Dismantling of existing structures like damaged RCC wall and other structure comprising of masonry, cement concrete of diferent grades, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of dismantled material with all lifts and lead of 1000 metres including all labour, machinaries, fuel, tools, hire and running charges of all machineries and equipment, transportation, gate entry fees, taxes but excluding GST etc. all complete as directed by Engineer-In-Charge. N.B.: Steel scraps, pipes etc. if any found during dismantling need to be returned to PPT Central Store.
Earthwork in excavation for all kinds of soils for foundation including setting out, dressing of sides, ramming of bottom, stacking the excavated material for refilling and disposal of surplus soil upto a lead of 5.0 km including all lift including all labour, material, T&P, fuels, gate entry fees, taxes but excluding GST etc. all complete as directed by Engineer in-Charge.
Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagment, hire & running charges of Pump, transportation charges, tollage, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required).
Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 cement: 3 Coarse aggregate : 6 hard granite graded chips of 20mm & below size Crusher Broken) for PCC mixed in a Mixer Machine/ Batching Plant, hoisting, laying over compacted surface, finished smooth to the exposed surface, compacting by rammer as directed, to proper level & gradient,barricading the work site, curing etc with supply of all materials, labour, engagement, hire & running charges of all machineries, transportation charges, Port entry fees, T&P and taxes excluding GST etc. all complete as directed by the Engineer-in-charge.
Reinforced Cement concrete of M-20 grade by using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for R.C.C work, mixing in a Batching Plant of suitable capacity, transporting the concrete by any approved means, hoisting, laying, compacting by niddle vibrator of approved capacity, finished smooth to the exposed surface to proper grade and camber, texturing the top surface with brooming with wire brush, curing including the cost of water, barricading the area if required etc. with supply of all materials, labour, T&P, Port entry fees, royalty, tollage, all transportation charges, all testing charges including cost for design mix, engagement, hire & running charges of all machineries etc. taxes excluding GST all complete as directed by Engineer in charge. [N.B:- (i)Two separate Mix Design shall be conducted with different Cement brand for RCC work, (ii) cost excluding cost of Reinforcement, bending/ binding charges, cost of binding wire and centering, shuttering. (iii) Provision of Batching Plant is essential (movebale is also acceptable].
Providing rigid, smooth leak proof Centering & shuttering for form works made out of good quality new ply/ steel shutters for raft,pavement slab,wall or any other structure as and where required, providing openings of specified size on wall, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including staging/ scaffolding with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, Port entry fees, taxes but excluding GST etc. all complete as directed by the Engineer-in-charge.
Foundation
RCC Wall
Supply of Fe-500 grade steel confirming to I.S. Specifications of SAIL/ RINL/ TISCON including cutting, straightening, bending, binding with binding wire of 18 to 20 gauge & placing the grills in position for RCC works including supply of all materials, labour, T&P, tollage, Port entry fees, execluding GST etc. all complete as directed by the Engineer-in-charge. (N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.)
Providing necessary shoring & shuttering in the excavated portion and providing props to support the excavated portion upto the required extent including all labour, materials, taxes, transport, gate entry fees, excluding G.S.T etc. as directed by the Engineer-in-charge.
Supplying of 150 dia. PVC pipes for placing as weep hole in both drains and culvert with cutting the pipe in required size and placing the pipes in proper manner during casting etc all complete with supply of all material, labour T&P, taxes, tollage etc all complete but excluding GST as per direction of Engineer-In-Charge.
Refilling with available excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in sides of foundation by transportating from stack in layers not exceeding 20Cm. thickness compacting in layers by ramming, watering including supply of all labour, materials, tools, equipments, hire & running charges of machinereis excluding G.S.T etc. complete as directed by the Engineer-in-charge.
Supplying the Crawler Mounted Crane (18Ton Capacity) for lifitng of heavy structure and placing in position with supply of all labour, T&P, POL, lubricants, transport, engagement, hire and running charges of machinaries, Port entry fees, safety measures, including all taxes excluding cost of GST etc. all complete as per direction of Engineer in-charge. [N.B.:-(1) No idle charges shall be paid, (2) Log Book to be jointly signed by Contractor & PPT employees every day].
Lifting the cover slab from platform site, transporting & placing the same on top of the drain without any damages to the wall and slab with supply of all labour, T&P, machineries, vehicles, equipments, gate entry fees, taxes but excluding GST etc. complete as directed by the Engineer-in-charge. (N.B.: Any damages occured during slab handling & positioning that the same will be done by the agency with their own cost)
SUSANTA KUMAR SWAIN
M/S BHAIRAB CHARAN SWAIN
Gyana Ranjan Mohanty
Skater Infratech India Pvt. Ltd.
SUBRAT KUMAR BEHURA
Aakar Infra Engineers PVT Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .