| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 LRejected-AOC | ₹3.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SASI BUILDERS L1 | K GANESAN L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 13 | m3 | 205.2 ₹2,667.60 | 214.6 ₹2,789.80 |
| 2.01 | Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. completeMDU-CORP-BUILDING DATA-P-27 | 5 | m3 | 418.1 ₹2,090.50 | 437.3 ₹2,186.50 |
| 3.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification MDU-CORP-BUILDING DATA-P-28 | 5 | m3 | 5,254.8 ₹26,274 | 5,496.5 ₹27,482.50 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc com;(R.C.C. Column)footing plinth beam and lintel sides using steel plates and angles MDU-CORP-BUILDING DATA-P-31 | 76 | m2 | 918.8 ₹69,828.80 | 961.1 ₹73,043.60 |
| 5.01 | Reinforced Cement concrete 1:1.5:3 (one cement, one and halfs and & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc., complete and also including fixing fan clamps and fixtures in rccworks wherever necessaryas directed by departmental officer etc., complete. MDU-CORP-BUILDING DATA-P-32 | 8 | m3 | 8,964.7 ₹71,717.60 | 9,377.1 ₹75,016.80 |
| 6.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floorsMDU-CORP-BUILDING DA-P-39 | 600 | kg | 91.7 ₹55,020 | 95.9 ₹57,540 |
| 7.01 | Plastering with cement mortar 1:3, 20mm, thick in all floors including cost and conveyance of all materilas to site andl abour charges etc, complete as per standard specifications (S.I.306) (Cor Building Data P.No-45) | 26 | m2 | 566.8 ₹14,736.80 | 592.9 ₹15,415.40 |
| 8.01 | Manufacturing and fixing in position RCC Precast Slab in C.C 1:1.5:3, using 20mm HBGS machine crushed jelly of following thickness, exculding cost of reinforcement grill but including moulding finishing curing and fixing in position etc., complete.50mm thick (Cor Building Data P.No-88) | 47 | m2 | 562.7 ₹26,446.90 | 588.6 ₹27,664.20 |
| 67.01 | Add GST 18% | 1 | GST | 48,383.4 ₹48,383.40 | 50,609 ₹50,609 |
Tender Value
₹3.2 L
EMD Value
₹3,178
Closing Date
11 Dec 2024, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of strom water drain at manmalai medu main road at ward 14
2024_MAWS_502184_1
E2 / Est.No. 45 / 2024 -25
Open Tender
Civil Works
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,178
8 Jan 2026
19 Nov 2024
11 Dec 2024
19 Nov 2024
11 Dec 2024
19 Nov 2024
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. completeMDU-CORP-BUILDING DATA-P-27
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification MDU-CORP-BUILDING DATA-P-28
Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc com;(R.C.C. Column)footing plinth beam and lintel sides using steel plates and angles MDU-CORP-BUILDING DATA-P-31
Reinforced Cement concrete 1:1.5:3 (one cement, one and halfs and & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc., complete and also including fixing fan clamps and fixtures in rccworks wherever necessaryas directed by departmental officer etc., complete. MDU-CORP-BUILDING DATA-P-32
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floorsMDU-CORP-BUILDING DA-P-39
Plastering with cement mortar 1:3, 20mm, thick in all floors including cost and conveyance of all materilas to site andl abour charges etc, complete as per standard specifications (S.I.306) (Cor Building Data P.No-45)
Manufacturing and fixing in position RCC Precast Slab in C.C 1:1.5:3, using 20mm HBGS machine crushed jelly of following thickness, exculding cost of reinforcement grill but including moulding finishing curing and fixing in position etc., complete.50mm thick (Cor Building Data P.No-88)
Add GST 18%
K GANESAN (BID ID -1207213)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid