Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC PANDAVESWAR BARDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | ₹7.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 LRejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹7.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹7.2 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹7.2 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ANIESH KHAN L1 | SABIR CONSTRUCTION L2 | NANDI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Power re-organization by establishment of new underground sub-station for new depillaring district J-18 panel as per advancement of working face at Pit No. B under Pandaveswar colliery. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Establishment of new sub-station at 27L/-15Dip by placing of 400 amps. Mine line ACB, 100 Amps Andru yule ACB, 100 amps ACB for haulage control, Mine line make 200 amps for 90 HP Haulage. | 80 | Manshift | 1,330.39 ₹1.1 L | 1,348.96 ₹1.1 L | 1,369.52 ₹1.1 L |
| 1.02 | Establishment of new sub-station at 28L/-19Dip by placing of Mine line make 300 amps. Mine line ACB, 100 Amps Andrew yule ACB, Mine Line make 100 amps ACB for 1887 SDL, Electroteknica make 200 amps ACB for 1839 SDL, Andrew Yule of 100 amps for drill panel. | 96 | Manshift | 1,330.39 ₹1.3 L | 1,348.96 ₹1.3 L | 1,369.52 ₹1.3 L |
| 1.03 | Re-organisation of secondary side VCB switch -03 nos. | 48 | Manshift | 1,330.39 ₹63,858.72 | 1,348.96 ₹64,750.08 | 1,369.52 ₹65,736.96 |
| 1.04 | Establishement of SDL 1887 controlling panel using Gate-end-Box, ACB, Trailling cable , Drill panel, Drill Cable etc. | 60 | Manshift | 1,330.39 ₹79,823.40 | 1,348.96 ₹80,937.60 | 1,369.52 ₹82,171.20 |
| 1.05 | Establishement of SDL 1839 controlling panel using Gate-end-Box, ACB, Trailling cable , Drill panel, Drill Cable etc. | 72 | Manshift | 1,330.39 ₹95,788.08 | 1,348.96 ₹97,125.12 | 1,369.52 ₹98,605.44 |
| 1.06 | Re-organisation of 3.3kV grade , 70 sqmm PVCDWA cable and 1.1 kV , 35 sqmm cable from -2 Dip/27L to -15Dip/27L & from -15D/27L to -19D/28L total | 64 | Manshift | 1,330.39 ₹85,144.96 | 1,348.96 ₹86,333.44 | 1,369.52 ₹87,649.28 |
| 1.07 | Nut Bolts, Washer, clamp, MS Flange, Bush Socket | 1 | Job | 2,360 ₹2,360 | 2,500 ₹2,500 | 2,400 ₹2,400 |
| 1.08 | Holding Bolt of 1.5 inch dia. for foundation of 02 nos. haualge | 1 | Job | 28,000 ₹28,000 | 29,500 ₹29,500 | 30,500 ₹30,500 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹7.0 L
EMD Value
₹8,700
Closing Date
20 Feb 2026, 9:00 amClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Power re-organization by establishment of new underground sub-station for new depillaring district J-18 panel as per advancement of working face at Pit No. B under Pandaveswar colliery
2026_ECL_352773_1
GM-PND/EandM/25-26/272/1556 dated 09/02/2026
Open Tender
Electrical and Maintenance Works
30 days
Pandaveswar Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,700
17 Mar 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
10 Feb 2026 - 13 Feb 2026
Power re-organization by establishment of new underground sub-station for new depillaring district J-18 panel as per advancement of working face at Pit No. B under Pandaveswar colliery. (Inclusive of EPF/CMPF)
Establishment of new sub-station at 27L/-15Dip by placing of 400 amps. Mine line ACB, 100 Amps Andru yule ACB, 100 amps ACB for haulage control, Mine line make 200 amps for 90 HP Haulage.
Establishment of new sub-station at 28L/-19Dip by placing of Mine line make 300 amps. Mine line ACB, 100 Amps Andrew yule ACB, Mine Line make 100 amps ACB for 1887 SDL, Electroteknica make 200 amps ACB for 1839 SDL, Andrew Yule of 100 amps for drill panel.
Re-organisation of secondary side VCB switch -03 nos.
Establishement of SDL 1887 controlling panel using Gate-end-Box, ACB, Trailling cable , Drill panel, Drill Cable etc.
Establishement of SDL 1839 controlling panel using Gate-end-Box, ACB, Trailling cable , Drill panel, Drill Cable etc.
Re-organisation of 3.3kV grade , 70 sqmm PVCDWA cable and 1.1 kV , 35 sqmm cable from -2 Dip/27L to -15Dip/27L & from -15D/27L to -19D/28L total
Nut Bolts, Washer, clamp, MS Flange, Bush Socket
Holding Bolt of 1.5 inch dia. for foundation of 02 nos. haualge
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_365570.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid