Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80,744.75Accepted-Finance | ₹80,744.75 | L1 | Accepted-Finance L1 |
| 2 | L2₹85,738+₹4,993.25 (6.18%)Rejected-Finance | ₹85,738+₹4,993.25 (6.18%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | T Vaithy L1 | A Annadurai L2 |
|---|---|---|---|---|---|
| 1.00Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.10 | c). Plain Surface | 13 | m2 | 1,147 ₹14,911 Lowest | 1,150 ₹14,950 |
| 1.20 | Providing and laying in position standardized concrete Mix M-20 Grade (1:1y:3) in accordance with IS 456-2000 using 20mm and below graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325kg/cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without impairing strength and durability with about (5.0cum), 7730kg of 20mm machine crushed stone jelly and with about (3.3cum), 5156kg of 10-12mm machine crushed stone jelly and with about (4.79cum) 7670kg of Q.dust, but excluding cost of reinforcement grill and fabricating charges centering and shuttering | 3.7 | m3 | 8,222.5 ₹30,423.25 Lowest | 9,300 ₹34,410 |
| 1.30 | Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of a | 387 | Kg | 91.5 ₹35,410.5 Lowest | 94 ₹36,378 |
Tender Value
₹99,000
Closing Date
19 Feb 2026, 3:00 pmClosed
THE ASSISTANT COMMISSIONER, AMMAPET ZONE, SALEM
Ammapet Zone , Salem City Municipal Corporation, Salem.
Providing Covering Slab to the Culvert at Annamalai Street in Division No. 38 of Ammapet Ward Office.
2026_MAWS_657493_1
L12-2673-2025
Open Tender
Civil Works
Lump-sum
30 days
Ammapet Zone-3, Salem City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
9 Jul 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.1 | c). Plain Surface | 13 | m2 | - | - |
| 1.2 | Providing and laying in position standardized concrete Mix M-20 Grade (1:1y:3) in accordance with IS 456-2000 using 20mm and below graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325kg/cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without impairing strength and durability with about (5.0cum), 7730kg of 20mm machine crushed stone jelly and with about (3.3cum), 5156kg of 10-12mm machine crushed stone jelly and with about (4.79cum) 7670kg of Q.dust, but excluding cost of reinforcement grill and fabricating charges centering and shuttering | 3.7 | m3 | - | - |
| 1.3 | Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of a | 387 | Kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
BOQ_788616.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .