Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹38.2 L+₹3.4 L (9.76%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹35.4 L
EMD Value
₹36,000
Closing Date
23 Jul 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Addl. Collector (Dev) / Project Director, DRDA
DRDA, Dharmapuri
Strengthening of the road from VCC Road to Kurumpatti Km.0/0-1/0 H/o.Pagalahalli
2024_RDTN_462518_1
Roc.No.1231/2023/R2 MGSMT P101
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹36,000
DRDA, Dharmapuri
24 Oct 2024
12 Jul 2024
23 Jul 2024
12 Jul 2024
23 Jul 2024
15 Jul 2024
15 Jul 2024
Amount
Strengthening of the road from VCC Road to Kurumpatti Km.0/0-1/0 H/o.Pagalahalli
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking the existing BT surface wornout surface including all labour charges etc
Collection and supply of Carted Earth from approved quarry an average lead 1Km including cost and conveyance of all materials to site and labour cahrges etc. SS20A
As per Calculation Sheet
Providing and Laying Gravel to 100mm compacted thick includign cost & conveyanec of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT ove WBM/WMM Surface at 7.00 Kg of SS-1 Bitumen Emulsion / 10 Sq.m including labour for spraying, hire charges for bitumen sprayer etc., completed
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic Compund with Reflectorising glass beads on bituminous surface etc
Supply and Fixing of HM Stone
Supply and Fixing of KM Stone
Provision for Sign Board
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SIVA KUMAR (BID ID -1089855)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .