works for effecting services in various schemes in Sampally Section in Mettur division
2024_EB_454779_1
SE/MEDC/AEE/MM/MTR/Spec No.001/24-25
Open Tender
Electrical Works
Works
365 days
Mettur EDC
EMD and documents as per BQR conditions
2 documents required · 2 mandatory
₹0
₹10,000
9 Aug 2024
15 Jun 2024
28 Jun 2024
15 Jun 2024
28 Jun 2024
15 Jun 2024
15 Jun 2024 - 28 Jun 2024
Amount
Work contract schedule
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB
Excavation of pole pit for 30' RCC Pole/9.00m PSC Pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Hard rock requires blasting
Hard rock without blasting (where houses are located)
Erection of PSC/RCC poles upto 8.00m. (27' ) by using Crane or manual
Erection of PSC/RCC poles upto 9.14m.( 30' ) by using Crane or maual
Erection of stay set complete
Fixing of HT "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Fixing of HT pin Insulators 11 KV
Fixing of HT 11 KV strain disc.
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
i) Fixing of LT pin Insulator
ii) Fixing of LT shackle
iii) Fixing of Aluminium Knob
Paving and Stringing of 7/3.35 mm ACSR 7/3.0 mm AAAC
Paving and stringing of 7/2.59 mm/ ACSR 7/2.11 mm ACSR
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of New Transformer all Capacities
Loading & Unloading of Transformer above 100 and upto 200
Transport of poles/Materials/ conductors and others. Below 8 Kms.
Loading of materials
Unloading of materials
Loading of Poles(7.5/8.0/9.14M)
Unloading of Poles(7.5/8.0/9.14M)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Alteration of Back clamp/Stay clamp
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of flat
Earthing of pole with coil earthing including burying looping and binding.
Dismandling of RCC/PSG pole 8.0mtr/7.5mtr
Dismandling of 'V' X arm,channel X arm,guarding X arm(all types)
Dismandling of 22KV pin insulator
Dismandling of HT 11 KV strain disc.
Dismandling of LT single phase X arm
Dismandling of LT 3 phase X arm
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium knob
Dismandling of stay set
Dismandling of ACSR 7/3.35mm conductor
Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor
Releasing of grills from RCC Poles
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Releasing of single phase service and re-fixing.
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .