Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC 117 BHAVAN 117 615 A PLOT NO 2 Q BLOCK SHARDA NAGAR KANPUR KANPUR NAGAR KANPUR CITY UTTAR PRADESH 208025 | KANPUR NAGAR | UTTAR PRADESH | 208025 | L1 | Accepted-AOC Bidder is L1 | |
| 2 | L2₹7.5 L+₹1.1 L (16.8%)Rejected-Finance | L2 | Rejected-Finance Bidder is not L1. | |
| 3 | L3₹9.3 L+₹2.9 L (45.1%)Rejected-Finance | L3 | Rejected-Finance Bidder is not L1. | |
| 4 | L4₹17.5 L+₹11.1 L (174.4%)Rejected-Finance | L4 | Rejected-Finance Bidder is not L1. | |
| 5 | Rejected-Technical | - | Rejected-Technical The bidder does not meet the PQC. |
Tender Value
Refer Docs
EMD Value
₹9,988
Closing Date
7 Jun 2022, 3:00 pmClosed
Deputy General Manager
Indian Oil Corporation Limited
Regular electrical and civil works at BKPL Allahabad pump station
2022_BKBRN_151512_1
ALTS222303
Open Tender
Electrical Works
Works
730 days
BKPL Allahabad
Please refer Tender document
6 documents required · 6 mandatory
₹9,988
Yes
30 Jun 2022
25 May 2022
8 Jun 2022
28 May 2022
7 Jun 2022
28 May 2022
Amount
Providing one unskilled manpower for assistance in Electrical and T&I maintenance works
Providing one set of liveries per year includes below items in list A,B and C: (A)Cotton uniform :Two sets of shirt and trousers (B)One pair of Safety shoes (Karam FS 05 or Bata Industrial Endura LC/S Tequivalent ; Standard : Conforming to IS 15298:2011 & DGMS and two pairof socks (C) One No. Full Sleeve Sweater for winter season.
Contractor's overhead and profit against items 1 & 2 stated above
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture.
Supply and installation of 12" Oscillating wall mounted bracket fan, noiseless, plastic moulded construction, rotary device for 3 step speed control integrated unit of approved make with all accessories complete in all respect.
Lettering with black Japan paint of approved brand and manufacture. [Note: Unit "EA" shall mean "PER LETTER PER CM HEIGHT"].
Cable Laying -Laying of all type of cables LT (PVC / XLPE / Armoured/Unarmoured/Power/ Control/ Signalling) in trenches, in cable racks, in trays, in protective pipes, poles,columns, in conduits, in panels and on structures etc.;including the supply and installation of all required materials such as fixing clamps ,screws, cable straps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and panels) complete in all respect, including cost of all labour, tools, consumable materials etc. and cutting the cables in required lengths as per drawings, specification and directions of Site Engineer / Engineer-in-Charge-Power cables LT : OD upto 20 mm
Centrifuging,filtering and dehydrating of the transformer oil of transformer to improve insulation level to the value recommended as per the relevant ISS and the manufacturer's recommendations and as per specifications,and directions of the Site Engineer/Engineer-in-Charge including supply of labour, tools and materials and all services rendered complete.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, all works up to any lead and lift, as directed by the Engineer-in-Charge :In all kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 [1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources]
Cleaning of terrace/ loft water storage tank (inside surface area) up to 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank, including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba, all complete as per the directions of Engineer-in-Charge. [Note: The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre if during cleaning any G.I. fittings or ball cock is damaged that is to be repaired by the Contractor at his own cost and nothing extra will be paid on this account].
Overhauling of exhaust/air circulator fans of various types/sizes makes and its bearings including removal from site, cleaning, greasing after degreasing, assembling and fixing in position, testing and commissioning including transportation from site to workplace and back all complete with labour and materials as per directions of Engineer-in Charge- Including supply and fixing of bearings of SKF make (2Nos. bearings)
Overhauling of ceiling/pedestal fans of various types/ sizes/make and its bearings including removal from site, cleaning, greasing after degreasing, assembling and fixing in position, testing and commissioning including transportation from site to workplace and back. All complete with labour and materials as per directions of Engineer-in Charge-Including supply and fixing of bearings of SKF make and bushes (as per original make) of both sides by Contractor
Overhauling and painting of Window AC, Split AC of different make & different capacities located at various location within the premises, job includes removal of machines from location, dismantling, cleaning, washing,chemical cleaning of condenser & cooling coil, overhauling,lubrication of blower motor, checking,repair/rectification/replacement of effective control component. Painting of all metal part and chassis cover internal painting with primer & outer painting with synthetic enamel paint. Cleaning of coil & condenser to be done with wire brush. Defective/damage insulation to be replaced.All the electrical wires must be dressed properly. Defective wires to be replaced including supply of wires. Cleaning/replacement of filter by Nylon filter. Re-assembly of machine, shifting to location & testing of machine. Job complete in all respect including men & material and as perand instruction of Site Engineer/Engineer-in Charge
Shubhash Chandra Tiwari
M/s Priya Associates
Razia Engineering
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .