Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹19,760
Closing Date
27 Aug 2026, 4:00 pm3d left
XEN REW Kathua
XEN REW Kathua
Constt. of Additional Classroom at MS Gowar wno 3
2026_RDPR_321597_6
e-NIT No.189/REW/K of 2026-27 Dated 20/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Duggan
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹19,760
20 Aug 2026
20 Aug 2026
28 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kind of soil , @ 75% | 15.66 | Cum | 479.3 | ₹7,505.84 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:Hard Rock , Lead upto 25m, @ 25% | 5.22 | Cum | 1,405 | ₹7,334.1 |
| 3 | P/l of soling incl. all carriages | 6.3 | Cum | 1,255.35 | ₹7,908.7 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.11 | Cum | 5,202.9 | ₹10,978.12 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% plum. | 14.69 | Cum | 4,774.6 | ₹70,138.87 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.55 | Cum | 6,591.25 | ₹16,807.69 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in 1:6 mix | 11.78 | Cum | 7,571.55 | ₹89,192.86 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 8.83 | Cum | 1,455.65 | ₹12,853.39 |
| 9 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Sal Wood | 0.25 | Cum | 1,42,085 | ₹35,521.25 |
| 10 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws using 2nd class Deodar wood 35mm thick. | 5.57 | sqm | 4,412.45 | ₹24,577.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.00 MB
BOQ_1074689.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].