Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 LAccepted-Finance | ₹6.9 L | 1 | Accepted-Finance ok |
Tender Value
₹6.6 L
EMD Value
₹13,200
Closing Date
25 Jul 2026, 6:00 pmClosed
executive officer
nagar palika mahwa
jain medikal ke pass nala nirman karya
2026_DLB_575197_1
330
Open Tender
Civil Works
Percentage
60 days
work
gst copy, tender fees, emd fees, pross fees, reg copy
2 documents required · 2 mandatory
₹500
executive officer nagar palika mahwa
₹13,200
Yes
13 Aug 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
25 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. | 108 | cum | 678 | ₹73,224 |
| 2 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. | 3,403.2 | kg | 83.3 | ₹2,83,486.56 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth
level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 6 | cum | 4,575 | ₹27,450 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth
level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size) | 35.2 | cum | 5,910 | ₹2,08,032 |
| 5 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including
strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 288 | sqm | 236.5 | ₹68,112 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_1022941.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .