| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.5 LAccepted-AOC | L1 | Accepted-AOC WORK AWARDED | |
| 2 | L2₹82.7 L+₹2.0 L (2.43%)Rejected-AOC | L2 | Rejected-AOC SECOND LOWEST | |
| 3 | L3₹83.2 L+₹2.5 L (3.11%)Rejected-AOC NO 150 METTU STREET ANUMANTHAI VILLAGE KUNNAVAKKAM POST CHENGALPET 603 002 | CHENGALPET | CHENGALPET | TAMIL NADU | 603002 | L3 | Rejected-AOC THIRD LOWEST |
| Sl No | Description | Qty | Unit | M.SEKAR L1 | KPD CONSTRUCTION L2 | S.VEERAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 225 | Cu.m | 261 ₹58,725 Lowest | 267 ₹60,075 | 269 ₹60,525 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 142 | Cu.m | 112 ₹15,904 Lowest | 114 ₹16,188 | 115 ₹16,330 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 54 | Cu.m | 1,804 ₹97,416 Lowest | 1,848 ₹99,792 | 1,860 ₹1,00,440 |
| 4.00 | Supplying and filling of conveyed Earth by lorry in basement filling including conveyance loading and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete as directed by the dept., Officers and complying with standard specification. | 678 | Cu.m | 371 ₹2,51,538 Lowest | 381 ₹2,58,318 | 383 ₹2,59,674 |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 45 | Cu.m | 5,512 ₹2,48,040 Lowest | 5,648 ₹2,54,160 | 5,685 ₹2,55,825 |
| 6.00Brick work in Cement Mortar 1:5 (One Cement and Five crushed stone sand) using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 6.01 | For Foundation and Basement | 96 | Cu.m | 7,632 ₹7,32,672 Lowest | 7,819 ₹7,50,624 | 7,871 ₹7,55,616 |
| 6.02 | For Superstructure In Ground Floor | 72 | Cu.m | 7,726 ₹5,56,272 Lowest | 7,916 ₹5,69,952 | 7,968 ₹5,73,696 |
| 7.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 322 | Sq.m | 697 ₹2,24,434 Lowest | 714 ₹2,29,908 | 719 ₹2,31,518 |
| 8.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 60 | Sq.m | 1,099 ₹65,940 Lowest | 1,126 ₹67,560 | 1,134 ₹68,040 |
Tender Value
₹79.5 L
EMD Value
₹50,000
Closing Date
15 Oct 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/o. The SE, PWD Buildings C and M Circle, Vellore
Providing Compound Wall and Additional amenities in the construction of District Library Office and Central Library building at Kancheepuram in Kancheepuram District
2025_PWD_612701_1
18/VLR-CLE/25-26-8/23.09.2025
Open Tender
Civil Works - Others
Lump-sum
150 days
KANCHEEPURAM IN KANCHEEPURAM DISTRICT
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹50,000
19 Nov 2025
10 Oct 2025
15 Oct 2025
10 Oct 2025
15 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .