Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹8,820
Closing Date
3 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O PROTECTION BUND AT DUMKHARDAL FROM LAND OF TARIQ AHMAD LONE UPTO MEHRAJ AHMAD BHAT TELWANI ACHABAL ANANTNAG
2026_RDPR_318062_7
ENIT78of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹8,820
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including surface excavation and removal of shrubs hurbs etc. | - | No | - | - |
| 0.0 | Earthwork in excavation by mechanical means including disposal of excavated earth upto lead 50m from cutting edge,disposed earth to be levelled and neatly dressed. | 44.86 | cum | - | - |
| 0.0 | Hand-Packing of stones (Nallah) in wire crates incl.cost of stones & carriage | 103.1 | cum | 1 | ₹103 |
| 0.0 | Supply of stones(nallah) incl.all leads,lifts,carriages complete av.lad of 5kms | 103.1 | Cum | - | - |
| 0.0 | Supply of 4mm dia B.A. wire woven crates 4"X4" mesh incl. all leads,lifts,carriages upto work site complete job incl.wrapping charges
tier 1 , TIRE 2, TIRE 3 | - | sqm | - | - |
| 0.0 | Filling available excavated material in trenches incl.watering, ramming etc complete. | 14.94 | Cum | - | - |
| 0.0 | Carriage of wire crates | - | TRIP | - | - |
| 0.0 | Carriage of Materials by HL by avg lead of 50 m | - | cum | - | - |
| 0.0 | Provision for sign board and photographs | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_1045847.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .