Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.5 LAccepted-AOC WARD NO 16 LOHARU ROAD TEHSIL AND DISTICT CHARKHI DADRI | LOHARU | CHARKHI DADRI | HARYANA | L1 | Accepted-AOC Accept | |
| 2 | L2₹59.1 L+₹54,992.53 (0.94%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹61.4 L+₹2.9 L (4.97%)Rejected-AOC VPO GUDHA DISTT M GARH | M GARH | L3 | Rejected-AOC Reject | |
| 4 | L4₹63.9 L+₹5.4 L (9.17%)Rejected-AOC MAHARANA PARTAP NAGAR MC COLONY ROAD BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | L4 | Rejected-AOC Reject |
Tender Value
₹64.9 L
EMD Value
₹1.3 L
Closing Date
8 Dec 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, M/Garh Canal W/S Division, NNL
Executive Engineer, M/Garh Canal W/S Division, NNL
Balance Required Quantity in Rehabilitation of Dochana Disty off-taking from RD Km 2.814/R of Narnaul Disty. (Re-invited)
2022_HRY_248149_1
2022734DA863 3C10 4A69 9B25 B3D9054107AC159IRR
Open Tender
Civil Works
Works
120 days
JAKHNI
Balance Required Quantity in Rehabilitation of Dochana Disty off-taking from RD Km 2.814/R of Narnaul Disty.
4 documents required · 4 mandatory
₹5,000
₹1.3 L
Yes
20 Mar 2023
1 Dec 2022
8 Dec 2022
1 Dec 2022
8 Dec 2022
1 Dec 2022
Amount
[HSR 11.5.3] 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) Through Rate
[HSR 14.10.1.1.1] Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum, 75mm thick in curve portion and side slope manually including rendering with cement sand (1:3) slurry, form work, dressing and preparation of sub grade as per directions of Engineer-in-charge. 1.1.1. 75mm thickness In bed Manually Through Rate
[HSR 14.10.1.2.1] Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum, 75mm thick in curve portion and side slope manually including rendering with cement sand (1:3) slurry, form work, dressing and preparation of sub grade as per directions of Engineer-in-charge. 1.2.1. In slope Manually Through Rate
[HSR 14.14.1] Curing Lining for 28 days 1. In bed Through Rate
[HSR 14.14.2] Curing Lining for 28 days 2. On Side slopes Through Rate
[HSR 14.15] Extra allowance for providing templates in curved portion of lining Through Rate
[HSR 14.17] Extra allowance for scaffolding, in tile and concrete lining for side slopes. Through Rate
[HSR 4.12.1] Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate
[HSR 5.25] Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Through Rate
[HSR 6.1.3] Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) Through Rate
[HSR 6.25.1] Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level Through Rate
[HSR 6.30.3] Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform Through Rate
[HSR 6.33.3] Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 3. Cold twisted bars Through Rate
[HSR 6.58] Providing and fixing in position 12mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints. Through Rate
[HSR 7.21.1] Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
Credit of old steel bar (NS)
NAURANG SINGH CONTRACTOR
DHARAMBIR S/O BUDH RAM
BIJENDER SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .