Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19,942Accepted-AOC | ₹19,942 | L1 | Accepted-AOC Being L1 for particular items |
| 2 | L1₹79,060Accepted-AOC SHOP NO 12 CHHABRA COMPLEX GULATI MARKET JAGADHARI ROAD AMBALA CANTT HARYANA 133001 | AMBALA | HARYANA | 133001 | ₹79,060 | L1 | Accepted-AOC Being L1 for particular items |
| 3 | L1₹80,030Accepted-AOC | ₹80,030 | L1 | Accepted-AOC Being L1 for particular items |
| 4 | L1₹82,600Accepted-AOC | ₹82,600 | L1 | Accepted-AOC Being L1 for particular items |
| 5 | L2₹3.6 LRejected-AOC | ₹3.6 L | L2 | Rejected-AOC Being not L1 for any item |
Tender Value
₹4.2 L
EMD Value
₹8,400
Closing Date
4 Sept 2023, 2:00 pmClosed
Asst Registrar
J.C. Bose University of Science and Technology
Purchase of Equipment for B.Sc. Physics Lab (Thermal Physics Laboratory)
2023_HRY_303198_1
JCBUST/P.S/2023-24/05
Open Tender
Laboratory and scientific equipment
Supply
45 days
J.C. Bose University of Science and Technology
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,400
Yes
J.C. Bose University of Science and Technology
13 Dec 2023
11 Aug 2023
5 Sept 2023
11 Aug 2023
4 Sept 2023
11 Aug 2023
18 Aug 2023
Equipment for B.Sc. Physics Lab (Thermal Physics Laboratory)
Set up for Mechanical equivalent of Heat (J) by Callender and Barne’s constant flow method (All specifications as per tender notice)
Set up for the coefficient of Thermal conductivity of Cu by Searle’s Method (All specifications as per tender notice)
Set up for the coefficient of Thermal conductivity of Cu by Angstrom method (All specifications as per tender notice)
Set up for the coefficient of thermal conductivity of bad conductors by Lee’s and charlton’s disc method (All specifications as per tender notice)
Set up for the temperature coefficient of Resistance by Platinum Resistance Thermometer (PRT) (All specifications as per tender notice)
Set up for the variation of thermo EMF of a thermocouple with difference of temperature of its two junctions (All specifications as per tender notice)
Setup to calibrate a Thermocouple to measure temperature in a specified range using Null method Direct measurement using OP Amp difference amplifier and to determine neutral temperature (All specifications as per tender notice)
Set up for Stefan’s constant using Black body radiation (All specifications as per tender notice)
Set up for measurement of Plank’s constant using Black body radiation (All specifications as per tender notice)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .