Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
12 Aug 2026, 1:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
NIT
15 conditions · 4 needing a document upload
As per PREAMBLE CLAUSE No. 11.2 of Tender Document:- The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V=Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
ELECTRICAL CONTRACTORS LICENSE:- The contractor shall fulfill valid Electrical Contractor License requirement as per IE Rule 1956 clause no- 45. Electrical Contractors license shall be submitted along with the offer, failing which the offer will summarily be rejected.
Technical Eligibility Criteria: As per clause 11.1 of Preamble and Scope of Work of uploaded tender document Page no. 4 & 6.
SIMILAR NATURE OF WORK: The contractor should have executed: "Repair/Rehabilitation/Overhauling/ AMC/ Supply, erection, testing and commissioning of Central AC unit/ Window AC /Package AC units / Air conditioning duct / Split type AC units / Water coolers etc."
23 conditions · 9 needing a document upload
All the supporting DOCUMENT(S)/CERTIFICATE(S) of as a proof Technical and Financial credentials as detailed in this tender Document, has/have been attached.
Supporting DOCUMENTS/CERTIFICATES as detailed in this Tender Document has been attached.
The Bid Security shall be deposited either in cash through e payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90 days beyond the bid validity period. The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids. (i.e. excluding the last date of submission of bids.) (See clause 1.10 of Chapter-I of Tender Document)
All the bidders / tenders should ensure that they are GST compliant and their quoted tax structure / rates are as per GST Law. (Copy of GST registration certificate)
Copy of PAN CARD
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
(A) Electrification and air conditioning of proposed replacement of Indoor & Outdoor signaling gears of DCC cabin with electronic interlocking in DW-PNVL section of Mumbai Division. (B) Electrification and Air conditioning of central cabin at DI, JNJ, NHU(NGSM), PNVL, MLND, BY, VK, VVH, DW, TLA, LNL under the work for extension of DN & UP Loop line by 75 m each at Bhivpuri road.
BB-LG-W-DW-2026-01
BB-LG-W-DW-2026-01
Open
Works - General
12 Months
Mumbai, Maharashtra
₹0
₹2.5 L
12 Aug 2026
21 Jul 2026
29 Jul 2026
120 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,09,88,526.87 | ||
| details. | Item Breakup for | — | — | ||
| (1) Supply, erection, testing and commissioning of 18-20 W 4 feet LED slim fitting complete with connection and necessary fixing arrangements as per site requirement. | — | — | — | 1,06,878.2 | |
| details. | Item Breakup for | — | — | ||
| (2) Supply, erection, testing and commissioning of surface mounted 18 W LED 1 x 1 light fitting complete with connections as per site requirement. | — | — | — | 1,19,132 | |
| details. | Item Breakup for | — | — | ||
| (3) Supply, erection, testing and commissioning of 2 x 2 36 W LED fitting complete with connection and necessary fixing arrangements as per site requirement. | — | — | — | 1,17,400.4 | |
| details. | Item Breakup for | — | — | ||
| (4) Supply, erection, testing and commissioning of 10 Watts LED bulkhead fitting complete with connections. | — | — | — | 10,125 | |
| details. | Item Breakup for | — | — | ||
| (5) Supply, erection, testing and commissioning of 40-45 W LED outdoor lighting fitting complete with all fixing arrangements. | — | — | — | 18,197.16 | |
| details. | Item Breakup for | — | — | ||
| (6) Supply, erection, testing and commissioning of 48" sweep energy efficient BLDC ceiling fan with down rod, motor, etc. with necessary connection. | — | — | — | 78,688.8 | |
| details. | Item Breakup for | — | — | ||
| (7) Supply, erection, testing and commissioning of 18" sweep plastic body wall bracket fan complete with necessary fixing arrangement. | — | — | — | 20,509.5 | |
| details. | Item Breakup for | — | — | ||
| (8) Supply ,erection testing commissioning of 18'' exhaust fan complete with motor guard, etc. | — | — | — | 12,252.18 | |
| details. | Item Breakup for | — | — | ||
| (9) Supply ,erection testing commissioning of 12'' fiber body shutter type exhaust fan complete with motor guard cover etc. | — | — | — | 7,579.5 | |
| details. | Item Breakup for | — | — | ||
| (10) Supply, erection, testing and commissioning of 18" industrial type pedestal fan. | — | — | — | 3,807.16 | |
| details. | Item Breakup for | — | — | ||
| (11) Wiring of the concealed Light / fan point with all accessories and running earthing copper conductor as per standard practice. The switches shall be of modular type. | — | — | — | 2,22,266.8 | |
| details. | Item Breakup for | — | — | ||
| (12) Wiring of the concealed 5A/ 5-Pin Universal plug point on separate switch board with all accessories and running earthing copper conductor as per standard practice. The switches shall be of modular type. | — | — | — | 7,715.2 | |
| details. | Item Breakup for | — | — | ||
| (13) Wiring of concealed the 5A/ 5-Pin Universal plug point (4 plug & 4 switch on board) with all accessories and running earthing copper conductor as per standard practice. The switches shall be of modular type. | — | — | — | 30,350.7 | |
| details. | Item Breakup for | — | — | ||
| (14) Wiring of concealed 15 Amps 6 pin wall socket point complete on separate switch board with all accessories and running earthing copper conductor as per standard practice. The switches shall be of modular type. | — | — | — | 19,262.2 | |
| details. | Item Breakup for | — | — | ||
| (15) Supply, Lifting Shifting, Erection, Installation, Testing and Commissioning of Outdoor Units of VRF system with Air-cooled condenser suitable for operation at ambient temp upto 56C, high pressure Scroll Compressors with hermetic motor, assembled and wired in a single package complete, starting controls, safety controls, operating controls and with full feature microcomputer based controller with programming/diagnosis facility. One/All Compressors shall be invertor type based on manufacturer's technology. The system should deliver rated capacity at ambient up to 43°C DB. (a) 28 HP Outdoor Unit | — | — | — | 9,39,467.84 | |
| details. | Item Breakup for | — | — | ||
| (16) Double skin AHU / ceiling suspended Ductable unit (as per site condition) complete with copper coil having 6 row with inlet and outlet connection capacity 8900 CFM, static pressure 100 mm belt driven , blower and filter section, belt driven suitable size of 3 phase electrical motor, necessary supply and return air opening with double door for inspection and maintenance work. The AHU panel are double skin duly fitted with 25 mm thick puff insulation inner skin will be 24 gauge G.I. and outer skin will be 24 gauge, powder coated with refrigeration piping. | — | — | — | 27,40,000 | |
| details. | Item Breakup for | — | — | ||
| (17) Supply, erection, testing and commissioning of AHU KIT. | — | — | — | 74,292.94 | |
| details. | Item Breakup for | — | — | ||
| (18) Supply, erection, testing and commissioning of AHU KIT controller. | — | — | — | 4,271.08 | |
| details. | Item Breakup for | — | — | ||
| (19) Supply, erection, testing and commissioning of Hard Copper refrigerant piping of suitable sizes for pair of gas (suction) & liquid, with 19/13 mm Closed Cell Insulation for Wrapping the copper pipe lines. The Piping system must be supported at specific distance. | — | — | — | 2,64,195 | |
| details. | Item Breakup for | — | — | ||
| (20) Supply, laying, running fixing of following sizes of XLPE insulated, PVC sheathed, armoured 1.1 KV grade cables shall be as per IS. (a) 4 core 16 sq.mm CU conductor armoured. (b) 4 C 4 sq.mm CU conductor armoured cable. (c) 3 C 6 sq.mm CU conductor armoured cable. | — | — | — | 65,149.6 | |
| details. | Item Breakup for | — | — | ||
| (21) Supply, laying and fixing of control cable with shielded copper 2 core 1 sq.mm cable for connecting all AHU units / Controller with ODU for communication. | — | — | — | 11,048.7 | |
| details. | Item Breakup for | — | — | ||
| (22) Drain piping in hard PVC with all fittings, supports and clamps. The piping shall be suitably insulated with 9mm thick closed cell foam Class O (Nitrile Rubber) stuck with approved adhesive compound.(25/50mm dia as per site requirement) | — | — | — | 22,923 | |
| details. | Item Breakup for | — | — | ||
| (23) Supply & return ducting in G.S.S Construction. The ducting shall be sealed with RTV sealant / soldered and rubber gaskets of following thickness with necessary supports, flanges etc. (a) 24 G (b) 22 G (c) 20G | — | — | — | 14,10,389 | |
| details. | Item Breakup for | — | — | ||
| (24) Supply, installation of exposed duct coating for supply and return air ducting with Aluminum cladding. | — | — | — | 10,60,000 | |
| details. | Item Breakup for | — | — | ||
| (25) Supply, erection, testing and commissioning of flexible connections (Canvas). | — | — | — | 3,656.48 | |
| details. | Item Breakup for | — | — | ||
| (26) Supply, installation, testing and commissioning of PC Monitoring system with MODBUS. | — | — | — | 98,295.97 | |
| details. | Item Breakup for | — | — | ||
| (27) Supply, laying and fixing of Control cable for PC Monitoring system. | — | — | — | 3,677 | |
| details. | Item Breakup for | — | — | ||
| (28) Supply, erection, testing and commissioning of GI Non Return Duct Damper. | — | — | — | 85,039.92 | |
| details. | Item Breakup for | — | — | ||
| (29) Supply, erection, testing and commissioning of Motorized Smoke & Fire Damper Approved as per UL-5555 Leakage Class II with Fire rating. | — | — | — | 43,742.74 | |
| details. | Item Breakup for | — | — | ||
| (30) Supply, erection, testing and commissioning of UL Certified Electrical Spring Return actuator with auxiliary switch. | — | — | — | 20,594.6 | |
| details. | Item Breakup for | — | — | ||
| (31) Supply, installation, testing and commissioning of Refrigerant Gas for Top up. | — | — | — | 14,450.4 | |
| details. | Item Breakup for | — | — | ||
| (32) Unloading, loading, shifting, positioning of all indoor/outdoor units. | — | — | — | 1,28,418.1 | |
| details. | Item Breakup for | — | — | ||
| (33) Providing and erecting approach system from outside the building to facilitate execution of work items in the form of steel tubular trestle type scaffold of approved design with necessary working platforms of approved design, ladders, guard rails, bottom runners, foundation etc. or in the form of suspended platforms, working platforms and riggers, counter Wright arrangements, wire ropes, breaking / locking arrangements or combination of above two methods including providing arrangements to control / arrest falling debris etc. complete and dismantling and carting away the system when the job is over. The system shall be so designed by contractor so as to reach any exterior location work. The item shall be paid only once. Payment will be make for length and height of scaffolding measured in elevation only. | — | — | — | 1,31,484 | |
| details. | Item Breakup for | — | — | ||
| 34) Supply, erection, testing and commissioning of duct insulation by 13 mm thick insulation with Al. foil. The duct Thermal insulation shall be of cross linked close cell Armacell / equivalent class O | — | — | — | 11,64,397.5 | |
| details. | Item Breakup for | — | — | ||
| (35) Supply, erection, testing and commissioning of acoustic insulation by open cell Nitrile rubber of 10 mm thick. The duct insulation shall be of cross linked close cell Armacell / equivalent class O | — | — | — | 5,73,345 | |
| details. | Item Breakup for | — | — | ||
| (36) Supply, erection, testing and commissioning of MS stand for condensing unit & MS tray for copper pipe & cables as per site requirement. | — | — | — | 84,260 | |
| details. | Item Breakup for | — | — | ||
| (37) Supply, erection, testing and commissioning of AHU Electrical Panel Complete with cubical panel required with switch gears, contactors, relay, outgoing connectors. Complete with internal wiring etc. for 2 Nos.AHU kits, sets for AHU & Associated equipment. | — | — | — | 1,65,000 | |
| details. | Item Breakup for | — | — | ||
| 38) Supply, laying, running fixing of following sizes of XLPE insulated, PVC sheathed, armoured 1.1 KV grade cables shall be as per IS. (a) 4 core 95 sq.mm AL conductor, armoured (b) 2 core 95 sq.mm AL conductor, armoured (c) 4 core 50 sq.mm AL conductor, armoured (d) 4 core 35 sq.mm AL conductor, armoured (e) 4 core 16 sq.mm AL conductor armoured. | — | — | — | 3,28,963 | |
| details. | Item Breakup for | — | — | ||
| 39) Excavation of cable trench on CC flooring / Hard / rocky soil & making of trench & recasting of flooring/pit after lying of cable as per railways requirement. | — | — | — | 18,789 | |
| details. | Item Breakup for | — | — | ||
| (40) Excavation of cable trench in soil & filling the trench with sand, pebbles etc. after laying of the cable complete with RCC warning cover & cable markers, sand etc. as per railways requirement. | — | — | — | 72,552 | |
| details. | Item Breakup for | — | — | ||
| (41) Supply and laying of RCC warning cover as per site requirement. | — | — | — | 12,600 | |
| details. | Item Breakup for | — | — | ||
| (42) Supply and laying of RCC pipe of size 6" dia 2 meter long with coupling. | — | — | — | 5,568 | |
| details. | Item Breakup for | — | — | ||
| details. | Item Breakup for | — | — | ||
| — | — | — | 8,118.84 | ||
| — | — | — | 17,925.48 | ||
| (47) Supply, erection, testing and commissioning of 400 A MCCB 2 nos. as incoming and 1 no. Auto changeover switch and 1 no. 250 A MCCB and 3 nos. 125 A MCCB as outgoing complete with busbars, neutral link, etc. | — | — | — | 2,51,805.68 | |
| details. | Item Breakup for | — | — | ||
| (48) Supply, erection, testing and commissioning of maintenance free earthing. | — | — | — | 1,50,666.89 | |
| details. | Item Breakup for | — | — | ||
| (49) Supply, erection, testing and commissioning of GI strip of 25 mm x 3 mm. | — | — | — | 78,540 | |
| — | — | — | 13,74,956.23 | ||
| details. | Item Breakup for | — | — | ||
| (1) Erection, testing and commissioning of 2.0 TR 5 star inverter type split AC unit etc. | — | — | — | 49,368 | |
| details. | Item Breakup for | — | — | ||
| (2) Supply, erection, testing and commissioning of refrigerant piping of size 5/8" or 1/2" copper and 1/4" or 3/8" copper made with insulation and 4 core 2.5 sq.mm copper wire and covered with PVC trunking of suitable size. | — | — | — | 4,62,132 | |
| details. | Item Breakup for | — | — | ||
| (3) Supply, erection, testing and commissioning of PVC pipe of 25 / 50 mm for drainage of condensate water. | — | — | — | 25,698 | |
| details. | Item Breakup for | — | — | ||
| (4) Supply, erection, testing and commissioning of MS stand for condensing unit & MS tray for copper pipe & cables as per site requirement. | — | — | — | 1,87,930.6 | |
| details. | Item Breakup for | — | — | ||
| (5) Supply, erection, testing and commissioning of 4 AC controllers timer and temperature based digital LCD Display, delay time, temperature calibration, high temperature alarm, low temperature alarm, auto override, 2 heavy duty relay out each 30 Amps load, Auto / Manual facility, high temperature alarm, auto / manual switch, potential free contact for high temperature alarm. | — | — | — | 2,15,142.4 | |
| details. | Item Breakup for | — | — | ||
| (6) Supply, laying, running fixing of following sizes of XLPE insulated, PVC sheathed, 1.1 KV grade cables as per IS. (a) 4 C 10 sq.mm CU conductor armoured. | — | — | — | 2,61,634.2 | |
| details. | Item Breakup for | — | — | ||
| (7) Wiring of concealed 15 Amps 6 pin wall socket point complete on separate switch board with 20 Amp DP RCBO & all accessories and running earthing copper conductor as per standard practice. The switches shall be of modular type. | — | — | — | 41,203.36 | |
| details. | Item Breakup for | — | — | ||
| (8) Supply, erection, testing and commissioning of Lighting Circuit Board, Double Door Powder coated with locking arrangement consisting 32 A DP RCBO as I/C and 6 Nos x 6 ASP MCB and 2 Nos x 20A O/G SP MCB Complete. | — | — | — | 52,960.27 | |
| details. | Item Breakup for | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CheckList.pdf
ATTACHMENT
TenderBookofRRIcabin_1.pdf
ATTACHMENT
GCC_April-2022upto11ACS.pdf GCC April 2022
ATTACHMENT
RDSOSPN_197Ver_1.pdf
ATTACHMENT
SpecificationBLDCceilingfan.pdf BLDC Ceiling fan Specification
ATTACHMENT
SpecificationBLDCceilingfan.pdf
ATTACHMENT
GCC_April-2022upto11ACS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .