| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | -37.11% | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹1.3 L (0.60%)Admitted-Finance | -36.73% | ₹2.1 Cr+₹1.3 L (0.60%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹6.6 L (3.18%)Admitted-Finance | -35.11% | ₹2.1 Cr+₹6.6 L (3.18%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹9.9 L (4.77%)Admitted-Finance | -34.11% | ₹2.2 Cr+₹9.9 L (4.77%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹18.9 L (9.14%)Admitted-Finance | -31.36% | ₹2.3 Cr+₹18.9 L (9.14%) | L5 | Admitted-Finance |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
27 May 2026, 6:00 pmClosed
EE RRP 2
JDA Jaipur
Construction and Strengthening of 25 m, 20 m and 18m wide BT Road in PAP Area (Inner and outer side) of Ring Road in Zone-14, JDA, Jaipur (Ch 12 plus 500 to 32 plus 900)(Phase -II CC Road)
2026_JDAJP_557059_1
EE_RRP2_2026_27_NIB_1
Open Tender
Civil Works
Percentage
180 days
EE RRP 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Online (JDA Portal)
₹6.6 L
Yes
3 Jun 2026
8 May 2026
3 Jun 2026
8 May 2026
27 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202
By Manual Means
Granular Courses | - | Cum | - | - |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202
By Mechanical Means
Bituminous Courses | 1 | Cum | - | - |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | - | Cum | - | - |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401
For Grading III Material | - | Cum | - | - |
| 5 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104
P.C.C grade M 15
Nominal mix (1:2.5:5 | - | Cum | - | - |
| 6 | Construction of un-reinforced , plain cement concrete pavement M-35 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | - | Cum | - | - |
| 7 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | - | Kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
DocConstPhase2CCRoadRRP2_1.pdf
Tender Documents • 4.28 MB
BOQ_991711.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .