| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹7.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹7.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹7.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹7.9 LAdmitted-Finance H NO 657 VPO KHERI MEHAM TEHSIL MEHAM DISTT ROHTAK 124112 | ROHTAK | HARYANA | 124112 | L1 | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹46,271
Closing Date
20 Jan 2026, 3:00 pmClosed
CHIEF ENGINEER
NNM
-Construction of drain and CC road from Surendra Goyals house to Kishan Lals house via Anupama Sharmas house in Ward-60, Phoolbag Colony.
2026_NNMEE_1104821_74
8715/SNV-80T/2026
Open Tender
Civil Works
Fixed-rate
60 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
NAGAR AYUKT NAGAR NIGAM
₹46,271
10 Feb 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
Dismentling of Old interlocking tiles with all comp.S.I No.New Item 4
Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).
Disposal of malba of 8 k.m.
Dismentling of B/W in cement motar with all comp of work
Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work SI no.273.
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work.
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc.
Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
RCC 1:1.5:3 in slab with cement coarse sand and grit 2 cm. gauge.
Mild steel or iron such as in plane reinforcement concrete.
Supply stacking and laying and 53mm to 22.4mm size stone aggregate. compction
Laying spreading and consolidation of 12 cm (loose) thick coat of stone ballast but excluding roller charge As per SI no 755 b
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels.rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-20)Same as above but when thikness of CC is less then 20 cm. (without dowel Bar)
Trimix for C.C. road etc.including hire & fuel charges of concrete floter + all comp.of work
Providing & appling concrete hardner on C.C. road top surface etc all comp.of work
Providing and filling in position rubbererized bitumen hot sealing compound for sealing of expansion joint in road /pavement including Groov cutting as per norms etc All as per direction of ingineer in charge
S/ fixing shine board at site +all comp of work
Deduction cost of old brick
Deduction cost of old brick bat
Deduction cost of old C.C. Tiles
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
74.pdf
Additional Documents • 0.39 MB
BOQ_2039000.xls
BOQ • 0.28 MB
NNMT1.pdf
Tender Documents • 5.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .