| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹14.3 L+₹74,930.61 (5.51%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹15.7 L+₹2.1 L (15.2%)Rejected-AOC | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S. KALIYAMOORTHY L1 | Ravichandran G L2 | KANDHAN CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.001.CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT VADAPATHIMANAGALAM HABITATON IN VADAPATHIMANGALAM PANCHAYAT | ||||||
| 2.00 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 38.27 | Cum | 250 ₹9,567.5 Lowest | 263.78 ₹10,094.86 | 263.78 ₹10,094.86 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.85 | Cum | 2,530 ₹22,390.5 Lowest | 2,615.97 ₹23,151.33 | 2,615.97 ₹23,151.33 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 9.66 | Cum | 6,221.5 ₹60,099.69 Lowest | 6,488.35 ₹62,677.46 | 6,488.35 ₹62,677.46 |
| 5.00 | Filling the basement with U S Gravel including cost and conveyance of | 11.77 | Cum | 936 ₹11,016.72 Lowest | 937.07 ₹11,029.31 | 937.07 ₹11,029.31 |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement | 6.13 | Cum | 5,963 ₹36,553.19 Lowest | 6,300.71 ₹38,623.35 | 6,300.71 ₹38,623.35 |
| 7.00 | . B) Above Basement | 16.96 | Cum | 6,051 ₹1,02,624.96 Lowest | 6,393.58 ₹1,08,435.12 | 6,340.35 ₹1,07,532.34 |
| 8.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | 46.64 | Sqm | 520 ₹24,252.8 Lowest | 547.5 ₹25,535.4 | 560 ₹26,118.4 |
| 9.00 | II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 107.69 | sqm | 1,040 ₹1,11,997.6 Lowest | 1,095 ₹1,17,920.55 | 1,100 ₹1,18,459 |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 2.15 | MT | 87,279 ₹1,87,649.85 Lowest | 91,895.3 ₹1,97,574.9 | 91,890 ₹1,97,563.5 |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
23 Sept 2026, 3:00 pmClosed
BDO-(BP)
Block Development Office Mannargudi
Construction Of Public Distribution Shop Vadapathimangalam Village
2026_RDTN_702629_1
1779/2026/A8
Open Tender
Civil Works - Buildings
Item Rate
Mannargudi Block
Asper Tender Document
3 documents required · 3 mandatory
₹0
₹14,500
BDO-Office Mannargudi
30 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
23 Sept 2026
9 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT VADAPATHIMANAGALAM HABITATON IN VADAPATHIMANGALAM PANCHAYAT | - | - | - | - |
| 2 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 38.27 | Cum | - | - |
| 3 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.85 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 9.66 | Cum | - | - |
| 5 | Filling the basement with U S Gravel including cost and conveyance of | 11.77 | Cum | - | - |
| 6 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement | 6.13 | Cum | - | - |
| 7 | . B) Above Basement | 16.96 | Cum | - | - |
| 8 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | 46.64 | Sqm | - | - |
| 9 | II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 107.69 | sqm | - | - |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 2.15 | MT | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_844677.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .