Tender Value
₹5.4 Cr
EMD Value
₹10.7 L
Closing Date
28 Sept 2026, 4:00 pm6d left
Executive Engineer-III (DP) ,DNH,Silvassa
Executive Engineer-III (DP) ,DNH,Silvassa
Installation of jali Painting and repair of open well in D and NH area (South Zone)
2026_UTDNH_8260_1
E TENDER NOTICE NUMBER 17 OF 2026-2027 (DP)
Open Tender
Civil Works - Water Works
Item Rate
90 days
UT of DNH
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Executive Engineer-III (DP) ,DNH,Silvassa
₹10.7 L
Yes
21 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
28 Sept 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.All strata | 1,276 | Cu.m | 1.25 | ₹1,595 |
| 2 | Clearing and grubbing road land including uprooting rank vegetation grass bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials(A) By manual means in area of light jungle | 0.51 | Hectare | - | - |
| 3 | Demolition and disposal of unserviceable materials with all lead and lift.(i) concrete. | 524 | Cu.m | -1.25 | - |
| 4 | Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar. | 470 | Cu.m | -2.5 | - |
| 5 | Masonary for well steining in CM 1:6 above ground level and upto 1.50mt depth below average ground level using burnt brick of standard size. | 366 | Cu.m | -3.75 | - |
| 6 | Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete | 1,489 | Cu.m | -5 | - |
| 7 | Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases of Columns etc. and Mass concrete. | 5,660 | Sq.mt | -6.25 | - |
| 8 | Cement plaster 20mm thick rought coat with 1:3 including water curing etc complete for well including cement finishing | 24,870 | Sq.mt | -7.5 | - |
| 9 | Finishing with a floating coat of neat cement slurry. | 4,914 | Sq.mt | -8.75 | - |
| 10 | Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level | 42,624 | Kg. | -10 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_8452.xls
BOQ • 7.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .