| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹7.4 L+₹49,016.97 (7.09%)Rejected-Finance | ₹7.4 L+₹49,016.97 (7.09%) | L2 | Rejected-Finance rejected |
| 3 | L3₹8.1 L+₹1.1 L (16.5%)Rejected-Finance | ₹8.1 L+₹1.1 L (16.5%) | L3 | Rejected-Finance rejected |
Tender Value
₹10.2 L
EMD Value
₹10,170
Closing Date
9 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER RANPUR
EXECUTIVE OFFICER RANPUR
CONSTRUCTION OF CC DRAIN WITH COVER SLAB FOR UNCOVERED DRAIN FROM POST OFFICE TO BAGHA SAMANTA FIELD IN WN -12 OF RANPUR NAC
2026_ORULB_126536_9
RNP NAC -07/2025-26
Open Tender
Civil Works - Others
Percentage
60 days
NAC RANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,170
Yes
7 Jul 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in hard soil including rough dressing and levelling the bed by depositing soil within initial lead and lift . | - | Cum | 1 | - |
| 2 | Filling in F&P with filling sand, well watered and rammed. | 11.55 | Cum | 668.2 | ₹7,717.71 |
| 3 | CC (1:3:6) with 40mm size H.G. metal including all costs. | 17.33 | Cum | 6,233.9 | ₹1,08,033.49 |
| 4 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting laying hire charges of concrete misture,vibrator watering curing and cost of all materials and labour T&P centering shuttering etc complete but excluding cost of reinforcement complete. | 65.48 | Cum | 6,368.4 | ₹4,17,002.83 |
| 5 | Supplying, Fitting and Fixing of HYSD bar Reinforcement as per drawing and technical specification including cost and convayance of all materials with labour T & P etc. all complete as per direction of EIC. | - | Qtl | 1 | - |
| 6 | Rigid and smooth centering and shuttering for cement concrete work and dismantling them after casting including cost and conveyance of all materials etc.
Wall-Drain | - | Sqm | 1 | - |
| 7 | Slab-Drain | - | Sqm | - | - |
| 8 | Supplying and Fixing a Display signboard at site made of M.S. plate and angles with writing details about the Project as per direction of Engineer-in-Charge | - | NO | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_583454.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .