Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.1 L+₹16,035.61 (8.07%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.3 L+₹31,834.09 (16.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.4 L+₹38,503.25 (19.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹2.4 L+₹38,503.25 (19.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹14,850
Closing Date
8 Jun 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
EXECUTIVE ENGINEER REW BUDGAM
Construction of P bund at Bharampora Irrigation Khul near new constructed Masjid Sharief at Baharampora at B K Pora
2026_RDPR_311049_5
NIT_008 REW BUDGAM OF 2026-27
Open Tender
Civil Works
Percentage
30 days
B K Pora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹14,850
18 Jun 2026
26 May 2026
9 Jun 2026
26 May 2026
8 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 16.99 | cum | 479.3 | ₹8,143.31 |
| 0_) | Providing and laying of dry stone solling hand packed including carriage average lead of 10 km, all complete job | - | cum | 1,265 | - |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 37.38 | cum | 5,733.6 | ₹2,14,321.97 |
| 0_) | 12 mm thick plaster in 1:4 cement mortar mix | 65.06 | sqm | 283.5 | ₹18,444.51 |
| 0_) | Centering and shuttering including strutting propping etc. and removal of same for foundations, footings, bases of columns etc | 55.76 | sqm | 286.35 | ₹15,966.88 |
| 0_) | Carriage of material by mechanical transport avg lead 07 kms including head load of 50mts | 51.24 | cum | 432.73 | ₹22,173.09 |
| 0_) | Provision for photographs signboard and paperwork | 1 | job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_1006983.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .