Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | ₹4.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.0 L+₹5,033.89 (1.02%)Rejected-Finance | ₹5.0 L+₹5,033.89 (1.02%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.0 L+₹6,529.11 (1.33%)Rejected-Finance | ₹5.0 L+₹6,529.11 (1.33%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical TUFANGANJ DHADIYAL COOCH BEHAR WB 736159 | TUFANGANJ | COOCH BEHAR | WEST BENGAL | 736159 | - | - | Not Admitted-Fee/PreQual/Technical Others-Bid withdraw self reasons |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bid withdraw self reasons |
Tender Value
₹5.0 L
EMD Value
₹10,100
Closing Date
17 Jun 2026, 1:00 pmClosed
PRODHAN
NAKKATIGACHH GP
EARTH WORK SINGLE BRICK FLAT SOLING CONCRETING SHUTTERING INSTALLATION SOLAR PANEL BORING PIPE PIPE LINE WORK ETC
2026_ZPHD_1027375_1
02/NGP/2026-27
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
30 days
NAKKATIGACHH GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹10,100
14 Aug 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
17 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation from foundation… | 4 | m3 | 119.27 | ₹477.08 |
| 2 | Earth work filling in foundation… | 2 | m3 | 77.54 | ₹155.08 |
| 3 | Single Brick flat solinf of picket jhama brick incliding ramming & dressing bed … local sand | 13.55 | m2 | 322 | ₹4,363.1 |
| 4 | Ordinary Cement Concrete work (1:2:4) with 20mm graded stone chips | 1.28 | m3 | 3,262.1 | ₹4,175.49 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | 2.45 | m3 | 4,567.21 | ₹11,189.66 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc | - | M.T | 61,283.7 | - |
| 7 | Hire & labour charges for shuttering with entering & necessary staging upto 4m using approved stout…. Complete | 16.06 | m2 | 205 | ₹3,292.3 |
| 8 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. | 8 | m2 | 32.71 | ₹261.68 |
| 9 | Labour for boring tube well of required dia. by water jet system through any type 5T soil strata including hire and labour charges for boring pipes……… 50mm dia boring etc. | 66 | m | 287 | ₹18,942 |
| 10 | 100 mm dia boring etc.. | 30 | m | 426 | ₹12,780 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_2523654.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .