Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 CrAdmitted-Finance | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 2 | L1₹7.9 CrAdmitted-Finance R O BIMAL HOTA GALI WARD NO 27 PO BUDHARAJA PS AINTHAPALI DIST SAMBALPUR | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 3 | L1₹7.9 CrAdmitted-Finance AT P O TANWAT PS NUAPADA DIST NUAPADA ODISHA PIN NO 766105 | NUAPADA | ODISHA | 766105 | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 4 | L1₹7.9 CrAdmitted-Finance | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 5 | L1₹7.9 CrAdmitted-Finance | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
Tender Value
₹7.9 Cr
EMD Value
₹7.9 L
Closing Date
5 May 2026, 5:00 pmClosed
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
ROAD WORK
2026_EICCL_128231_1
CCENC (R AND B) / 22/ 2025-26
National Competitive Bid
Civil Works - Roads
270 days
sarda to NH-53, KUCHINDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹7.9 L
Yes
21 May 2026
20 Apr 2026
6 May 2026
20 Apr 2026
5 May 2026
20 Apr 2026
20 Apr 2026 - 28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto 1000m lead including cost of all labour, machinery etc complete as per Technical Specifications and Clause - 201 of MoRT&H Specifications for Road & Bridge works (5th Revision). | - | Sqm | 1 | - |
| 2 | Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 mtr etc | - | Cum | - | - |
| 3 | Dismantling Brick work in cement mortar in parapet including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of,unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | - | Cum | 1 | - |
| 4 | Removing 600mm to 900mm Size of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | - | Rmt | 1 | - |
| 5 | Excavation for road work in soil with hydraulic excavator 0.9 Cum capacity including cutting, trimming bottom & side slopes and transporting to the embankment locations upto 1000m lead with cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision). | - | Cum | - | - |
| 6 | Loosening, leveling and Compacting original ground to facilitate placement of first layer of embankment, scarified to a depth of 150mm, compacted at OMC to achieve minimum dry density conforming to Table 300-2 with cost of all labour, machinery etc complete as per Technical Specifications and Clause - 305.3.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 1 | cum | 1 | ₹1 |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and foundation excavation of CD & structures graded and compacted to meet requirement of table 300-2 including cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). | - | cum | 1 | - |
| 8 | Fine dressing and turffing the slope of the embankment with compacted turff grass with carriage within 5.0km as per Clause 307of MoRT&H Specifications for Road and Bridge works (4th Revision) complet including all labours,hire and running charges of all machineries,T&P ,sundries etc. complete as per spcification and direction of Engineer-in-Charge.. | - | Sqm | - | - |
| 9 | Providing compacted granular materials in shoulder by using moorum having required P.I. value spreading in uniform layers not exceeding 100mm in depth and compacting with smoth wheeled roller to achieve the desired density including cost, conveyance, royality of moorum & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 408 of MoRT&H Specifications for Road & Bridge works (5th Revision). | - | Cum | 1 | - |
| 10 | Providing G.S.B. Gr-VI stone screaning materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, as per approved Drawing & Technical Specifications and as per Clause - 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
5SARDA.pdf
Tender Documents • 1.46 MB
BOQ_588124.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid