Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC AT NARAHARIPUR PO HENSMYL TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹7.6 L Quoted ₹6.4 L | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS |
| 2 | L2₹7.2 LRejected-Finance AT BAGHUABOL PO TALCHER PS TALCHER DIST CUTTACK ODISHA 759100 | ANUGUL | ODISHA | 759100 | ₹7.2 L | L2 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 3 | L3₹7.5 LRejected-Finance AT PO REMUAN ARYAVIHAR HATATOTA TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹7.5 L | L3 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 4 | L4₹9.2 LRejected-Finance PLOT NO 4541 8062 INDRAHARI NAGAR TURANG DIST ANGUL ODISHA 759122 | DHENKANAL | ODISHA | 759122 | ₹9.2 L | L4 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 5 | L5₹9.4 LRejected-Finance | ₹9.4 L | L5 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
Updated dates
Tender Value
₹12.3 L
EMD Value
₹15,400
Closing Date
26 Mar 2026, 6:55 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Strengthening of foundation of Rail In-motion Weighbridge With Portable Cabin at SILO Phase-II at Bhubaneswari OCP,Bhubaneswari Area.
2026_MCL_357138_1
MCL/GM(JA)/SO(C)/e- Tender/25-26/139, Dtd-19/03/26
Open Tender
Civil Works - Others
30 days
Bhubaneswari OCP
AS PER NIT
3 documents required · 3 mandatory
₹15,400
28 Apr 2026
19 Mar 2026
27 Mar 2026
19 Mar 2026
26 Mar 2026
19 Mar 2026
19 Mar 2026 - 20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil. | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Constructing cast-in situ RCC diaphragm wall by providing and laying machine batched, machine mixed, self compacting, ready mix reinforced cement concrete, tramie controlled, of M 30 grade using minimum 400 kg cement per cum of concrete including providing and mixing required admixtures in recommended proportions as per IS : 9103, as approved by the Engineer-in-charge, for achieving 150 - 200 mm slump, for diaphragm wall having thickness as per approved structural design not exceeding 600 mm, in pannels of required depth and lengths as per approved drawing, including constructing necessary guide walls as required and as specified including boring in all kinds of soils and rocks, including working in or under water and / or liquid mud, in foul conditions and pumping or bailing out of water and removing slush, including disposal of earth/ rock/ slush etc. for all leads and all lifts, including preparing, providing and re-circulating bentonite slurry in the trench as and when required for all depths, including agitating bentonite slurry during trenching etc., providing and fixing stop ends or form tubes, upto the required depth of diaphragm wall including extracting the same afer casting, including chipping of the bentonite adulterated concrete or unsound concrete up to the cut of level for obtaining the sound concrete, dressing undulations on the exposed face of diaphragm wall after excavation by chipping / chiseling etc. including filling the depression/ cavities with sound concrete etc. complete and as directed by the Engineer-in-charge, including providing recess for bearing plates and fixing insert boxes for inclined rock anchors etc. complete as per the specifications and approved design and as directed by the Engineer-in-charge, but excluding the cost of reinforcement and inserts. (rates include cost of all inputs of labour, material and T & P, cost of handling, lifing & placing in position the reinforcement cage in the trench, including the additional cost of welding the reinforcement bars etc. involved in the work and all other incidental expenditure for completing the work as directed by the Engineer-in- charge), However, the actual area of the diaphragm wall, correct to two places of decimal, from design bottom level to the design cut of level (including portion anchored in the rock upto the design bottom level) only shall be measured for payment. (rates include cost of all inputs of labour, material and T & P, cost of handling, lifting & placing in position the reinforcement cage in the trench, including the additional cost of welding the reinforcement bars etc. involved in the work and all other incidental expenditure for completing the work as directed by the Engineer-in-charge), However, the actual area of the diaphragm wall, correct to two places of decimal, from design bottom level to the design cut of level (including portion anchored in the rock upto the design bottom level) only shall be measured for payment. Excess/less cement used for design mix including the extra cement required for under water concreting is payable / recoverable separately. | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars | - | kg | - | - | BI01010001010000000000000515BI0100001119 | |
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - | BI01010001010000000000000515BI0100001119 | |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:l%:3 (1 Cement: l% coarse sand (zone-lll) derived lrom natural sources :3graded stone aggregate 20 mm nominalsize derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 1.53 MB
BOQ_370007.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid