Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 02 SILI JAGEER PIPLIYA BAHERI BAREILLY UTTAR PRADESH 243202 | BAREILLY | UTTAR PRADESH | 243202 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
17 Feb 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Shahjahanpur
Electy. Trans. Circle Shahjahanpur
Patrolling and Maintenance work at 220/132 KV Trans. Lines under ETD Shahjahanpur
2022_UPTCL_675471_1
83 ETC(S)/2021-22
Open Tender
Electrical Works
Fixed-rate
365 days
Shahjahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹35,000
27 May 2022
4 Feb 2022
17 Feb 2022
4 Feb 2022
17 Feb 2022
4 Feb 2022
4 Feb 2022 - 16 Feb 2022
120 days
Amount
Routine work:- Tower to Tower ground patrolling of various 132KV & 220KV transmission line alongwith ground work i.e. identification of missing tower parts, nuts & bolts, faulty discs insulator damaged conductor tower earthing and other dangerous aspects observed in line the report must be submitted in Division & Circle immediately after each patrolling. All labour T&P vehicle etc. is to be arranged by contractor at his own cost. Patrolling of line is to be done quarterly basis i.e. four times in a year. Note:-Patrolling report of executed work will be submitted to Concerned E.E. and S.E. ETC, Shahjahanpur by the contractor within 10 Days after patrolling. Falling which payment will be withheld by the concerned E.E for executed work
220KV Shahjahanpur-Roza DC Line-19.477 KM
220KV Azizpur-Shahjahanpur SC Line-39.918 KM
220KV Azizpur-PGCIL DC Line- 24.412 KM
132KV SPN-Powayan Line(Ckt-Ist)-21 KM
132KV Powayan- Maqsoodapur SC Line-24 KM
132KV Powayan – Banda Line-28.454 KM
132KV SPN-Roza TSS Line-9 KM
132KV SPN-Nigohi(DSML) SC Line-16 KM
132KV SPN–Maqusadapur Line(Bajaj Energy-Ist) up to 12 No. Tower-8.62KM
132KV SPN–Maqusadapur Line(Bajaj Energy-IInd) -44.80KM
132KV I/C-Ist Line(From 220KV S/S SPN)-7.850KM
132KV I/C-IInd Line(From 220KV S/S SPN)-3.5KM
132KV Shahjahanpur-Tilhar SC Line-22KM
132KV Tilhar-Budaun Line from Lilo-36KM
132KV SPN- Jalalabad SC Line-35.31 KM
132KV Azizpur-Srimau DC Line- 37.813 KM
132KV Gola-Banda SC Line- 50 KM
132KV SPN-Powayan Line(Ckt-IInd)-20 KM
132KV Azizpur-Jalalabad SC Line- 26.5 KM
Tree cutting of different type of tree coming within the 27mtr(For 132KV Line) & 35mtr(For 220KV Line) corridor to line as per following details-
Up to 0.5 Meter girth of tree
Above 0.5 to 1.0 Meter girth of trees
Lopping Chopping of various trees falling in the corridor of line
Emergency Patrolling of the above line including intimation of arrangement of shut down faults short coming etc. to be recorded and reported to the Engineer in charge of the line.(474.65x2=949.3Km)
Fixing of tower members nuts bolts as directed by SDO/JE concerned, Punching of bolts by champhering fabrication cartage etc. including opening/cutting of Nuts/Bolts of remaining cut pieces of tower member thefted by miscreants to be opened/cut safely with the help of gas cutter/Hacksaw blade, including all required labour. T&P vehicle etc. required for completion above work.
Cleaning of porcelain insulators (Only in polluted area) once in a year in oct. to nov.
Attending breakdown of conductor such as broken conductor cutting of strands or snapping of conductor following works are to be carried out and other works which are required for maintenance of line
Attending breakdown due to failure of disc insulator and replacement of tension string alongwith mobilisation of skilled gang including carriage of material from store to site and site to store for completion of work.
Attending breakdown due to failure of disc insulator and replacement of Suspension string alongwith mobilisation of skilled gang including carriage of material from store to site and site to store for completion of work.
Dismantling opening of earthwire of one span of size 7/10.7/9 SWG including earthwire accessories etc. lowering earthwire between location with suspension clamps,copper bonds clipping etc. Rerolling of dismantled earthwire on drum and shifting to designated store.
Laying, Tension, Stringing ,Clamping, Jointing etc. of earth wire including fitting of all earth wire accessories, carriage of material from store to site of work.
Dismantling,opening of ACSR conductor of one span and accessories along with Disc Insulator string, lowering down of conductor and accessories from tower location including clipping of conductor, re-rolling of dismantled conductor drum and shifting to designated store.
Laying, Tension, Stringing ,Clamping, Jointing etc. as per requirement of ACSR Panther/Zebra conductor includinghoisting of insulator strings armoured rod vibration damper etc and all associated work for completion of job.
Thermal scanning of line by high resolution infra red camera min. resolution 240*320 using telephoto lenses of 7-14 deg (min. dist. 150 meter) of all sections tower jumpers including all mid span joints during on load conditions under ETD Shahjahanpur and providing coloured print of report in to sets(Once in a year before summer)
Checking and tightening of jumpers, replacement of deteriorated jumpers (once in a year after thermal scanning)
Awadh Construction Company
LASHANI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .