Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.5 L+₹2,388.70 (0.19%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.6 L+₹3,645.90 (0.29%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹14.8 L
EMD Value
₹1.3 L
Closing Date
8 Apr 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Repair work of damaged manhole of service road from Mira intersection to Asafabad intersection.
2026_DOLBU_1131671_4
18/PWD/2025-26
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,534
Municipal Corporation
₹1.3 L
Yes
21 Apr 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existing structure Prestressed/reinforced cement concrete grade by mechanical means cement concrete grade M-20 & above. (PWD SOR 2025-26, chapter No. 10, SI No.-21 | - | Cum | - | - |
| 2 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete slab including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level : 1:1.5:3 (1cement : 1.5 coarse sand: 3graded stone aggregate 20mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). | - | Cum | - | - |
| 3 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) CH-5-SI.N.12 Spec.No-5.3 | - | Cum | - | - |
| 4 | Supply and fixing of Precast EHD cover with frame (600MM DIA) including supply of all material, labour, T&P etc complete Market rate) | - | Nos | - | - |
| 5 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Asner Analysis of Rate) | - | Qtl | - | - |
stage.html
html • 0.03 MB
techsummary_2111764.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2111764.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .