| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.8 L+₹1.7 L (9.05%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RSR CONSTRUCTION L1 | DD CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Pre Measurement for Dismantling and Clearing of Brick Work Masonry in Cement Mortar walls under 3m height including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 14 | Cum | 250 ₹3,500 Lowest | 300 ₹4,200 |
| 2.00 | Pre Measurement for Dismantling and Clearing of Reinforced Cement Concrete Structures like Column, Roof Beam, Slab using deploying machineries including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 10 | Cum | 4,000 ₹40,000 Lowest | 5,000 ₹50,000 |
| 3.00 | Pre Measurement for Dismantling and Clearing Doors, Windows and Shutters including removal of frames, hinges and fastenings and Carefully Stacking of Materials useful for re-use for any thickness of walls including the Labour Cost in Complete as per Standard Specification | 16 | Sqm | 100 ₹1,600 Lowest | 200 ₹3,200 |
| 4.00 | Pre Measurement for Dismantling and Clearing of Plain Cement Concrete Surfaces like Flooring including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 5 | Cum | 450 ₹2,250 Lowest | 550 ₹2,750 |
| 5.00 | Pre Measurement for Dismantling and Clearing of Random Rubble Masonry in Cement Mortar walls under 3m height including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 7 | Cum | 250 ₹1,750 Lowest | 350 ₹2,450 |
| 6.00 | Conveyance Charges towards Transportation of the Demolished / Dismantled Debris from the Site to the Low Laying area or the Processing Centre including Loading and Unloading Charges in Complete as per Standard Specification with Initial Lead of 3 Km | 24 | Cum | 55 ₹1,320 Lowest | 100 ₹2,400 |
| 7.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,Earth Work for Drain | 38 | Cum | 270 ₹10,260 Lowest | 350 ₹13,300 |
| 7.01 | Earth work excavation for Plinth Beam | 4 | Cum | 100 ₹400 Lowest | 200 ₹800 |
| 8.00 | Plain Cement Concrete 1:4:8 (one cement, four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 12 | Cum | 5,500 ₹66,000 Lowest | 6,500 ₹78,000 |
| 9.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed | 27 | Sqm | 700 ₹18,900 Lowest | 800 ₹21,600 |
Tender Value
₹23.5 L
EMD Value
₹23,500
Closing Date
27 Feb 2026, 3:00 pmClosed
commissioner
The Commissioner, Hosur City Municipal Corporation, Bagalur ROad, Hosur
Construction of RO Shed, Toilet Block, Maintenance work at Ward No 31 Corporation Middle School Kamaraj Colony Tamil in Hosur City Municipal Corporation
2026_MAWS_654842_10
854/2025/E1/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
90 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹23,500
10 Oct 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pre Measurement for Dismantling and Clearing of Brick Work Masonry in Cement Mortar walls under 3m height including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 14 | Cum | - | - |
| - | Pre Measurement for Dismantling and Clearing of Reinforced Cement Concrete Structures like Column, Roof Beam, Slab using deploying machineries including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 10 | Cum | - | - |
| - | Pre Measurement for Dismantling and Clearing Doors, Windows and Shutters including removal of frames, hinges and fastenings and Carefully Stacking of Materials useful for re-use for any thickness of walls including the Labour Cost in Complete as per Standard Specification | 16 | Sqm | - | - |
| - | Pre Measurement for Dismantling and Clearing of Plain Cement Concrete Surfaces like Flooring including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 5 | Cum | - | - |
| - | Pre Measurement for Dismantling and Clearing of Random Rubble Masonry in Cement Mortar walls under 3m height including the Labour Cost and Removal of Debris in Complete as per Standard Specification | 7 | Cum | - | - |
| - | Conveyance Charges towards Transportation of the Demolished / Dismantled Debris from the Site to the Low Laying area or the Processing Centre including Loading and Unloading Charges in Complete as per Standard Specification with Initial Lead of 3 Km | 24 | Cum | - | - |
| - | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,Earth Work for Drain | 38 | Cum | - | - |
| - | Earth work excavation for Plinth Beam | 4 | Cum | - | - |
| - | Plain Cement Concrete 1:4:8 (one cement, four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 12 | Cum | - | - |
| - | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed | 27 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786267.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.32 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_786267.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .