Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.0 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹43.5 L+₹2.4 L (5.94%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | m/s sharma enterprises L2 | VIKRAM SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Repair of damaged water connections including labour and material charges, complete in all respect. | 10 | Each | 1,200 ₹12,000 | 1,000 ₹10,000 Lowest |
| 2.00 | Recovery of old bricks, recovered from site during demolishing work, complete in all respect. | 6,115 | Each | 3 ₹-18,345 Lowest | 4.5 ₹-27,517.5 |
| 3.00 | Recovery of brick bats,recovered from site during demolishing work,complete in all respect. | 8.49 | Each | 2 ₹-16.98 Lowest | 1,800 ₹-15,282 |
| 4.00 | Dewatering from nallah including pump charges, operator charges and diesel charges,complete in all respect | 180 | Each | 450 ₹81,000 | 100 ₹18,000 Lowest |
| 5.00 | Repair of damaged sewer connection including required material and labour charges, complete in all respect | 10 | Each | 1,800 ₹18,000 | 1,500 ₹15,000 Lowest |
Tender Value
₹46.1 L
EMD Value
₹92,220
Closing Date
18 Sept 2026, 5:00 pmClosed
Pardeep Kalyan
Municipal Corporation Karnal
Construction of Chand Sarai main road with cement concrete from Chand Sarai Entry to Shiv Temple, Ward no.6, M.C. Karnal.(Recall)
2026_HRY_546243_1
202670840D88 C086 4217 8E0F 1A660C52DB42747ULB
Open Tender
Civil Works
Works
120 days
Karnal
2 documents required · 2 mandatory
₹5,000
₹92,220
Yes
7 Oct 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair of damaged water connections including labour and material charges, complete in all respect. | 10 | Each | - | - |
| 2 | Recovery of old bricks, recovered from site during demolishing work, complete in all respect. | 6,115 | Each | - | - |
| 3 | Recovery of brick bats,recovered from site during demolishing work,complete in all respect. | 8.49 | Each | - | - |
| 4 | Dewatering from nallah including pump charges, operator charges and diesel charges,complete in all respect | 180 | Each | - | - |
| 5 | Repair of damaged sewer connection including required material and labour charges, complete in all respect | 10 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_625871.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .