| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC COIMBATORE | ₹16.3 L | L1 | Accepted-AOC Eligible |
| 2 | Rejected-Technical 9 K K NAGAR 10TH STREET POLICE QUARTERS ROAD GANAPATHY COIMBATORE 641 006 | COIMBATORE | TAMIL NADU | 641006 | - | - | Rejected-Technical in Eligible |
| Sl No | Description | Qty | Unit | SRI BANU CONSTRUCTIONS L2 | K R R CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation and depositing on Bank with metal lead of 10m and initial of 2m in Hard stiff clay, stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all labour charges etc.complete as per SS 20 B TNDSS No 23, 24 VI(S2),VI, VII.9 & 10 | 233 | M3 | 131 ₹30,523 | 130 ₹30,290 Lowest |
| 2.00 | Providing and Laying Wet Mix Mecadam using 0.396m3 of 45-22.40mm graded metal, 0.528m3 of 22.40-2.36mm graded metal and 0.396m3 of 2.36 and below size graded metal premixed with water to a densemass on a prepared subgrade / base to template in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406. | 130 | M3 | 2,520 ₹3,27,600 | 2,515 ₹3,26,950 Lowest |
| 3.00 | Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5. | 1,295 | M2 | 84 ₹1,08,780 Lowest | 84 ₹1,08,780 Lowest |
| 4.00 | Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5. | 1,295 | M2 | 19 ₹24,605 Lowest | 19 ₹24,605 Lowest |
| 5.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of vt 30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5. | 65 | M3 | 10,700 ₹6,95,500 Lowest | 10,700 ₹6,95,500 Lowest |
| 6.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for premixing for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5. | 39 | M3 | 11,300 ₹4,40,700 Lowest | 11,300 ₹4,40,700 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
9 Feb 2026, 3:00 pmClosed
Executive Officer
Kannampalayam Town Panchayat Kannampalayam Coimbatore 641402
General Fund 2025-26 Providing BT Road From Shanthi Gears Road to Pallapalayam Road in Kannampalayam Town Panchayat Coimbatore District
2026_DTP_652727_1
34/2026
Open Tender
Civil Works
Item Rate
90 days
Kannampalayam Town Panchayat Office
As per Norms
1 document required · 1 mandatory
₹0
₹20,000
28 Mar 2026
7 Feb 2026
9 Feb 2026
7 Feb 2026
9 Feb 2026
7 Feb 2026
7 Feb 2026 - 9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation and depositing on Bank with metal lead of 10m and initial of 2m in Hard stiff clay, stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all labour charges etc.complete as per SS 20 B TNDSS No 23, 24 VI(S2),VI, VII.9 & 10 | 233 | M3 | - | - |
| 2 | Providing and Laying Wet Mix Mecadam using 0.396m3 of 45-22.40mm graded metal, 0.528m3 of 22.40-2.36mm graded metal and 0.396m3 of 2.36 and below size graded metal premixed with water to a densemass on a prepared subgrade / base to template in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406. | 130 | M3 | - | - |
| 3 | Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5. | 1,295 | M2 | - | - |
| 4 | Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5. | 1,295 | M2 | - | - |
| 5 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of vt 30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5. | 65 | M3 | - | - |
| 6 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for premixing for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5. | 39 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_782654.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_782654.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .