Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance NEW THEED HARWAN SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
Closing Date
27 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer University of Kashmir
Construction Division
Construction of Ramp for Garbage Site at Naseem Bagh Campus.
2021_UDJK_153147_1
F (UCD)(Garbage Ramp)/KU/73/21
Open Tender
Civil Works
Item Rate
45 days
Naseembagh Campus
As per NIT
8 documents required · 8 mandatory
₹200
Registrar University of Kashmir
Exempted
28 Dec 2021
14 Dec 2021
28 Dec 2021
14 Dec 2021
27 Dec 2021
14 Dec 2021
120 days
Amount
Earth work in excavation by mechanical means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead as directed from edge of cutting . All kinds of soil.
Providing and laying G.S.B. of required size and shape including compacting, watering and consolidation with power road roller to the required gradient and camber including all carriages of material complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all levels. 1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 20mm nominal Size) Crushed
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement all work up to all levels. 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) Crushed
Centering and shuttering including strutting propping etc. removal of form work inFoundation footings basis of columns etc. for mass concrete.
Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete up to all floors. Thermo mechanically heated bars.
15mm thick cement plaster on rough side of single or half brick / concrete wall of mix 1:6 (1cement: 6 coarse sand)
MIR MUNEER HUSSAIN
waris majid
TAHA CONSTRUCTIONS
AFTAB AHMAD BANDAY
M/S ASIF FAYAZ ZAZ
stage.html
html • 0.03 MB
finance_339173.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .