Tender Value
₹2.1 L
EMD Value
₹5,056
Closing Date
9 Jul 2026, 6:55 pmDue today
Pankaj Garg
Municipal Committee Bawani Khera
Construction of Cow dung stick based green crematorium as per HHRC in Valmiki Shamshan Ghat at MC Bawani Khera
2026_HRY_533071_1
202665FD6C04 1307 4BFC B79F F3347EE2EF3A343ULB
Open Tender
Civil Works
240 days
Bawani Khera
2 documents required · 2 mandatory
₹500
₹5,056
Yes
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 6.15.1-Reinforced cement concrete work in walls
(any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone III) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 5969.00 Through Rate | - | cum | 5,969 | - |
| 2 | HSR Item 6.30.5-Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers
HSR Rate(Rs.) 296.00 Through Rate | 1 | Sqm | 296 | ₹295.7 |
| 3 | HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2.
Cement Concrete 1:8:16 with stone aggregate 40 mm size in
foundation and plinth.
HSR Rate(Rs.) 1863.00 Through Rate | - | cum | 1,863 | - |
| 4 | HSR Item 4.14.1-Earth work in excavation by mechanical
means (Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
HSR Rate(Rs.) 83.00 Through Rate | 1 | cum | 83 | ₹82.92 |
| 5 | HSR Item 7.21.1-Brick work with common burnt clay non
modular bricks of class designation 10.5 in foundation and
plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
HSR Rate(Rs.) 4128.00 Through Rate | - | cum | 4,128 | - |
| 6 | HSR Item 7.22.1-Brick work with common burnt clay non
modular bricks of class designation 10.5 in superstructure
above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
HSR Rate(Rs.) 4404.00 Through Rate | 1 | cum | 4,404 | ₹4,399.6 |
| 7 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where
not included in the complete rate of RCC, including
straightening, cutting, bending, placing in position, binding,
wastage, overlaps, welded joints, spacer bars, chairs, stays,
hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
HSR Rate(Rs.) 68.00 Through Rate | - | Kg | 68 | - |
| 8 | HSR Item 11.59-Providing and applying plaster of paris putty
of 2 mm thickness over plastered surface to prepare the
surface even and smooth complete.
HSR Rate(Rs.) 71.00 Through Rate | - | Sqm | 71 | - |
| 9 | HSR Item 13.29.2-Steel work welded in built up sections/
framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using
structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg | 83 | - |
| 10 | HSR Item 10.1.1.1-Providing and laying of base course of
floors consisting of 100 mm thick cement 1:8:16 and 100
mm sand or stone filling. 1.1. Re-compacting excavated soil in plinth under floors, including watering, ramming,
consolidating and dressing complete.
HSR Rate(Rs.) 73.00 Through Rate | 1 | cum | 73 | ₹72.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_612141.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid