Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
2 Jun 2021, 2:00 pmClosed
Executive Engineer Hydraulic Division Kishtwar
Executive Engineer Hydraulic Division Kishtwar
Please refer BOQ
2021_PHE_125220_2
e-NIT 10 of 2021-22
Open Tender
Civil Works
Item Rate
216 days
Kishtwar
Please refer NIT
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer Hydraulic Division Kishtwar
₹5,000
Yes
3 Jun 2021
25 May 2021
2 Jun 2021
25 May 2021
2 Jun 2021
25 May 2021
Amount
Construction of Muthu bund ,Comparising boulders and wood bushes in alternate layers working in water conditions.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits, and the like not exceeding 10 sqm on plan , 100% Akos
Slip Clearance in ordinary soils disposal lead upto 50 mtr lead and lift upto 1.50 mts.
Slip Clearance in soil mixed with moorum /kanker/shingle/boulders disposal lead upto 50 mtrs and lift upto 1.50 mts.
Slit clearance from canal.inclusive of initial lead and lift up (50m&1.5 m respectively) Dry Slit
Wet Slit
Dry Random rubble masonry with hard stone in foundation and plinth using nallah stone without bound stone (Full rate)
Dry Random rubble masonry with hard stone in foundation and plinth using nallah stone without bound stone (Labour rate)
Random Rubble Masonry with Hard Stone in Foundaton and Plinth Including Leveling up with cement concreate 1:6:12(Full Rate)Cement motar
Random Rubble Masonry with Hard Stone in Foundaton and Plinth Including Leveling up with cement concreate 1:6:12(Labour Rate)
Providing and laying in position cement concrate of specified grade including curing but excluding the cost of centring and shuttering -ALL work upto plinth level with (1:3:6) 20mm
Providing and laying in situ concreate lining 50mm thickusing M-10 nomianl mix concreate 20mm
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12 mm cement plaster of mix Fine sand.
Hand Packing of Stone in wire crates excluding cost of crates and stones
Supply of Stone .
Supply of 2nd class kail wood in scants and in Planks for wooden flumes.
Providing corugated G.S Sheets Roofing including virtical (0.50mm Th with zinc coated not less then 275gm/sqm.
Labour Required for repair of wooden flumes regulation of water ,Cheseling of huge stones,durring crop sesaon(2nd Class) Mazdoor
Mason
Carpenter
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge. External work including trenching, refilling Carrage ete and Make of Supreme , Prince, Fenolex,Astral 0.60 kg/Mtr 150mm nominal outer dia pipes..
Carriage of stone from source to site of work by manual labour/Ponies of an avg distance By Head Load 1.0 km
Carriage of stone from source to site of work by manual labour/Ponies of an avg distance By Head Load 0.50 km
Carriage of sand from source/Stacking to site of work by manual labour/Ponies of an avg distance By Head Load 1.0 Km
Carriage of Cement from Local Market to site of stacking by Mech. Transport 30 kms
Carriage of sand from source/Stacking to site of work by Mechnical Transpost of an avg distance 30 Km
Carriage of Cement from Stacking site to Site of Work.avg Distance by Head Load 1.0 Km
Carriage of Cratefrom Divisional Store to Site of Stacking Distance by Mechnical Transport 30 Kms
Carriage of Cratefrom Stacking Site to Site of Work byHead Load. 1.0 Kms
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
Supply of EC Bags
Riyaz Ahmed Saroori
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .