Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
15 Jun 2026, 5:00 pmClosed
- Poshan Sahu(DFLT)
NAGAR PANCHAYAT PALLARI
Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work Including05 Years of Operation and Maintenance of the Entire System InNagar Panchayat Palari under SBM 2.0(5th Call)
188482
NIT NO: 366/Dated 06.04.2026 Design, Construction, Testing, Commissioning of all the Components of
RESTRICTED TENDER
WORKS
LUMPSUM
15 days
NAGAR PANCHAYAT PALLARI
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
23 documents required · 23 mandatory
Urban Administration and Development Department (UADD)
WORKS
- Poshan Sahu(DFLT)
RESTRICTED TENDER
LUMPSUM
A B
NAGAR PANCHAYAT PALLARI
TENDER SECTION
NAGAR PANCHAYAT PALLARI
120
15
No
0
188482
15 Jun, 2026 5:00:00 PM IST
19 Jun, 2026 4:30:00 PM IST
6 Apr, 2026 5:00:00 PM IST
NIT NO: 366/Dated 06.04.2026 Design, Construction, Testing, Commissioning of all the Components of
Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work Including05 Years of Operation and Maintenance of the Entire System InNagar Panchayat Palari under SBM 2.0(5th Call)
150000.00 INR
Fixed Deposit Receipt (OFFLINE)
2
19 Jun, 2026 4:00:00 PM IST
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
23 documents required · 23 mandatory
₹0
₹1.5 L
15 Jun 2026
6 Apr 2026
19 Jun 2026
6 Apr 2026
19 Jun 2026
Lump Sum offer for Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work including 05 Years of Operation and Maintenance of The Entire System at Nagar Panchayat, Palari Offer is inclusive of GST and all other applicable taxes etc. Total Lump-sum offer quoted by the bidder includes 05 years of Operation and Maintenance. The quoted rate shall be deemed bifurcated between construction and O&M as follows: (i) Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work – 88.6 % of quoted rate (ii) 05 Years of Operation and Maintenance of The Entire System – 11.4 % of quoted rate.
UOM Name
Percentage
% of Cost of Bridge (excluding Maintenance) sanctioned by competent authority
Per mile
1000 piece
Per Diem Rate
MAN DAYS
Siemens Per meter
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
1482562865026475419_178154_drawing 12.pdf
NIT • 20.96 MB
2148728953489855966_178154_drawing 7.pdf
NIT • 13.16 MB
215513501872790859_178154_drawing2.pdf
NIT • 31.66 MB
2741997357723425499_178154_drawing 6.pdf
NIT • 14.17 MB
4927017808476496313_178154_drawing 9.pdf
NIT • 13.30 MB
5668394498335831472_178154_drawing 4.pdf
NIT • 18.05 MB
606906653783840867_178154_drawing 8.pdf
NIT • 5.74 MB
7422052610049748042_178154_drawing 10.pdf
NIT • 10.31 MB
7595520939124554762_178154_Drawing1.pdf
NIT • 36.76 MB
7931685577085788103_178154_drawing 5.pdf
NIT • 22.42 MB
7941127317841204072_178154_drawing 11.pdf
NIT • 17.93 MB
8992884623843121436_188482_Palari Tender 5th Call.docx
NIT • 10.64 MB
3185160481011935635_178154_rfqItemUploadSORFormat__Palari.xlsx
BOQ • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .