Chairman
J K Bazar Tarakeswar 712410
Construction of Drain and Drains Slab ( 6 Nos Scheme) in Booth no.- 258 within Tarakeswar Municipality
2025_MAD_956274_1
UDMA/TRK/e_NIT/2025-26/24
Open Tender
CIVIL WORKS
Percentage
60 days
Tarakeswar Municipality
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,010
Yes
22 Dec 2025
22 Nov 2025
20 Dec 2025
22 Nov 2025
18 Dec 2025
22 Nov 2025
SUB HEAD 1. Construction of Surface Drain from H/o.-Arman to H/O.- Gopal Goswami within Tarakeswar Municipality. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Do - by fine sand
Single bricks flat soiling with picked Jhama bricks including preparation of bed including ramming, dressing bed to proper level and filling joints with powdered earth or local sand.
Cement concrete with graded stone ballast (40 mm. size) excluding shuttering. (A) In Ground floor.(A) [Pakur Variety] [PWD SOR, V- I, 3rd Corrigenda & Addenda, Page No. - 34, Sl No. -22(a)]
Brick work with 1st class bricks in cement mortar (4:1) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. [PWD SOR, V- I, P-16,Sl -16)3rd Corrigenda & Addenda]
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor)[P -189, Sl - 1 & 3rd corrigenda] (A) With 6:1 cement mortar, (a) 20 mm. thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.[P -190, Sl - 15 & 3rd corrigenda]
CGST @ 9% + SGST @ 9 %
Labour welfare cess @1%
SUB HEAD 2. Construction of Surface Drain from H/o.-Asish Ghosh to H/O.- Swapan Bag in ward no-9 within Tarakeswar Municipality. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Do - by fine sand
Single bricks flat soiling with picked Jhama bricks including preparation of bed including ramming, dressing bed to proper level and filling joints with powdered earth or local sand.
Cement concrete with graded stone ballast (40 mm. size) excluding shuttering. (A) In Ground floor.(A) [Pakur Variety] [PWD SOR, V- I, 3rd Corrigenda & Addenda, Page No. - 34, Sl No. -22(a)]
Brick work with 1st class bricks in cement mortar (4:1) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. [PWD SOR, V- I, P-16,Sl -16)3rd Corrigenda & Addenda]
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor)[P -189, Sl - 1 & 3rd corrigenda] (A) With 6:1 cement mortar, (a) 20 mm. thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.[P -190, Sl - 15 & 3rd corrigenda]
CGST @ 9% + SGST @ 9 %
Labour welfare cess @1%
SUB HEAD 3. Construction of Surface Drain from H/o.-Kiran Adhikary to H/O.- Payel Bhakat within Tarakeswar Municipality. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Do - by fine sand
Single bricks flat soiling with picked Jhama bricks including preparation of bed including ramming, dressing bed to proper level and filling joints with powdered earth or local sand.
Cement concrete with graded stone ballast (40 mm. size) excluding shuttering. (A) In Ground floor.(A) [Pakur Variety] [PWD SOR, V- I, 3rd Corrigenda & Addenda, Page No. - 34, Sl No. -22(a)]
Brick work with 1st class bricks in cement mortar (4:1) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. [PWD SOR, V- I, P-16,Sl -16)3rd Corrigenda & Addenda]
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor)[P -189, Sl - 1 & 3rd corrigenda] (A) With 6:1 cement mortar, (a) 20 mm. thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.[P -190, Sl - 15 & 3rd corrigenda]
CGST @ 9% + SGST @ 9 %
Labour welfare cess @1%
SUB HEAD 4. Construction of Surface Drain from H/o.-Siva Das to H/O.- Dipu Das within Tarakeswar Municipality. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Do - by fine sand
Single bricks flat soiling with picked Jhama bricks including preparation of bed including ramming, dressing bed to proper level and filling joints with powdered earth or local sand.
Cement concrete with graded stone ballast (40 mm. size) excluding shuttering. (A) In Ground floor.(A) [Pakur Variety] [PWD SOR, V- I, 3rd Corrigenda & Addenda, Page No. - 34, Sl No. -22(a)]
Brick work with 1st class bricks in cement mortar (4:1) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. [PWD SOR, V- I, P-16,Sl -16)3rd Corrigenda & Addenda]
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor)[P -189, Sl - 1 & 3rd corrigenda] (A) With 6:1 cement mortar, (a) 20 mm. thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.[P -190, Sl - 15 & 3rd corrigenda]
CGST @ 9% + SGST @ 9 %
Labour welfare cess @1%
SUB HEAD 5. Construction of Surface Drain from H/o.-Soudip Nandi to H/O.- Hasina Begam. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Do - by fine sand
Single bricks flat soiling with picked Jhama bricks including preparation of bed including ramming, dressing bed to proper level and filling joints with powdered earth or local sand.
Cement concrete with graded stone ballast (40 mm. size) excluding shuttering. (A) In Ground floor.(A) [Pakur Variety] [PWD SOR, V- I, 3rd Corrigenda & Addenda, Page No. - 34, Sl No. -22(a)]
Brick work with 1st class bricks in cement mortar (4:1) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. [PWD SOR, V- I, P-16,Sl -16)3rd Corrigenda & Addenda]
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor)[P -189, Sl - 1 & 3rd corrigenda] (A) With 6:1 cement mortar, (a) 20 mm. thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.[P -190, Sl - 15 & 3rd corrigenda]
CGST @ 9% + SGST @ 9 %
Labour welfare cess @1%
SUB HEAD 6. Construction of Drain Cover Slab at verious places in Booth no.- 258 within Tarakeswar Municipality. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
CGST @ 9% + SGST @ 9 %
Labour welfare cess @1%
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.22 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Additional_Document.pdf
Additional Documents • 0.46 MB
FORM_2911.pdf
Tender Documents • 0.17 MB
BOQ_2295813.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .