Tender Value
₹16.0 L
EMD Value
₹32,070
Closing Date
12 Jun 2026, 6:00 pm6d left
Nodal Officer (Tender)
O/o Sr. Chief Engineer(Civil) BSNL MP Civil Zone Block-C, BDA Flats, First Floor, Vidya Nagar, Behind Petrol Pump Hoshangabad Road , Bhopal (M.P.)- 462026
Re Construction of Compound wall for land acquired by NHAI in Telephone Exchange Compound at Ganj District Chhatarpur
2026_BSNL_279847_1
NIT NO. 03/EE(C) /BSNL-BPL/2026-27
Open Tender
Civil Works
120 days
Chhatarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO Cash BSNL Sagar
₹32,070
4 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 4 | One Cubic Metre | 3,551.25 | ₹14,205 | Item Code /01 |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 5 | One Cubic Metre | 263.95 | ₹1,319.75 | Item Code /02 |
| 3 | Supplying and filling with moorum in trenches , sides of foundations plinth and under floor and levelling of site in layers not exceeding 20 cms in depth consolidation each deposited layer by watering , ramming etc. complete. | 45 | One Cubic Metre | 284.86 | ₹12,818.7 | Item Code /03 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 5 | One Cubic Metre | 7,178.75 | ₹35,893.75 | Item Code /04 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8 | One Cubic Metre | 9,045.75 | ₹72,366 | Item Code /05 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : (a) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | One Cubic Metre | 10,852.95 | ₹65,117.7 | Item Code /06 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 4 | One Cubic Metre | 11,505.5 | ₹46,022 | Item Code /07 |
| 8Centering and shuttering including strutting, propping etc. and removal of form for : | ||||||
| 8.01 | Suspended floors, roofs, landings, balconies and access platform | 23 | One Square Metre | 927.25 | ₹21,326.75 | Item Code /09 |
| 8.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 60 | One Square Metre | 736.4 | ₹44,184 | Item Code /10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_326594.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid