Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹50.0 LAccepted-AOC | ₹50.0 L | 1 | Accepted-AOC ok |
Tender Value
₹51.6 L
EMD Value
₹1.0 L
Closing Date
30 Jun 2022, 12:00 pmClosed
Executive Engineer, Karnal W/S Division, Karnal
Executive Engineer, Karnal W/S Division, The Mall Road Karnal
Reconstruction of V.R. Bridge at RD 87450 of Nardak Disty (On Risk and Cost)
2022_HRY_226818_1
No. 5767-81/53M dated 20/06/2022
Open Tender
Civil Works - Bridges
Item-rate/Agreement basic
120 days
KARNAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.0 L
Yes
20 Sept 2022
22 Jun 2022
30 Jun 2022
22 Jun 2022
30 Jun 2022
22 Jun 2022
Amount
Works Details
Demolishing cement concrete manually/ by mechanical means including disposal of material (Nominal concrete 1:2:4 or leaner mix (i/c equivalent cum design mix) including machinery & labour charges complete in all respect as per direction of Engineer-in-Charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material (in cement Mortar) including machinery & labour charges complete in all respect as per direction of Engineer-in-Charge.
Earth work excavation in all kind of soil including breaking of clouds, removal of grass etc. with all lead & lifts including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORT&H specifications Ordinary soil by Mechanical means Depth upto 3 m including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Rehandling of earth work with all lead & lifts including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Centering and shuttering including strutting, propping etc. And removal of form for Suspended floors, roofs, landings, balconies (For Main Slab) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Providing and laying M-15 in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge, all works upto plinth level, cement content including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer,manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge., all works upto plinth level cement content including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer,manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge., all works above plinth level upto floor IV level cement content including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:3 (1 cement: 3 coarse sand) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Providing and fixing premoulded joint filler, for expansion joints, including the cost of sealing compound & primer coat including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (110mm Dia.)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc.complete in all respect below plinth level, Thermo-Mechanically Treated bars of grade Fe-500D or more. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Filling sand behind the structure including watering, ramming, consolidating and dressing etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Painting on concrete surface, Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1litre for 2 sqm. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
D/d Credit:- Bricks removed after dismantling
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .