| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.7 LAccepted-AOC DAFAI NO 2 NEAR MASJID NEW MAJRI KOLLIERY PO SHIVAJI NAGAR TAH BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | MAHARASHTRA | 442503 | L-1 | Accepted-AOC Work Awarded | |
| 2 | L-2₹4.6 L+₹87,164.24 (23.4%)Rejected-Finance AT KUCHANA POST KUCHANA TAH BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | MAHARASHTRA | 442503 | L-2 | Rejected-Finance Due to L-2 bidder. | |
| 3 | L-3₹5.1 L+₹1.4 L (38.1%)Rejected-Finance | L-3 | Rejected-Finance Due to L-3 bidder. |
Tender Value
₹6.2 L
EMD Value
₹7,800
Closing Date
29 Oct 2024, 12:00 pmClosed
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Providing buttress wall to compound wall at Kuchana Housing Complex of Majri Area.
2024_WCL_319330_5
ma9511-civ-e024-2024-25/473 Dated 17.10.2024
Open Tender
Civil Works - Others
Item Rate
45 days
Kuchana Housing Complex
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,800
10 Dec 2024
18 Oct 2024
31 Oct 2024
19 Oct 2024
29 Oct 2024
19 Oct 2024
19 Oct 2024 - 26 Oct 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Supplying and filling in plinth with sand under floors, including watering, ramming,consolidating and dressing complete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand).
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Providing and fixing concertina coil fencing with required dia 600 mm upto 3m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. stud tied with G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wire tied to angle iron all complete as per direction of Engineer-in-charge with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm. with tape (0.52 mm thick) of Supreme make or equivalent and weight 43.478gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work
Total impact of GST for the purpose of CTC
SUNIL SABALE CONSTRUCTION
HAIDRI CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .