| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 CrAccepted-AOC 8 1 B PAHARPUR HOUSE DIAMOND HARBOUR ROAD ALIPORE KOLKATA WEST BENGAL 700027 | KOLKATA | WEST BENGAL | 700027 | ₹15.9 Cr Quoted ₹18.7 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹18.9 CrRejected-Finance | ₹18.9 Cr | L2 | Rejected-Finance Non - L1 Bidder |
| 3 | L3₹19.9 CrRejected-Finance PLOT NO 83 84 SHED NO A1 7 GIDC UMBERGAON GIDC UMBERGAON UMBERGAON VALSAD GUJARAT 396171 | VALSAD | GUJARAT | 396171 | ₹19.9 Cr | L3 | Rejected-Finance Non - L1 Bidder |
| 4 | Rejected-Technical PLOT NO 53 B INDUSTRIAL AREA NO 1 A B ROAD DEWAS MADHYA PRADESH 455001 UDYAM MP 16 0001781 23AAECM4586A1ZR R M MII STATUS AS VERIFIED | DEWAS | MADHYA PRADESH | 455001 | - | - | Rejected-Technical NOT MEETING BQC CRITERIA OF NIT. |
Tender Value
Refer Docs
EMD Value
₹13.7 L
Closing Date
26 Aug 2024, 3:00 pmClosed
SANKHA PANDA
TECHNIP ENERGIES INDIA LIMITED, A4, SECTOR 1, NOIDA, PIN-201307
EPCC PACKAGE FOR COOLING TOWER WORKS ALONG WITH ITS ASSOCIATED PACKAGES (SIDE STREAM FILTER PACKAGE AND DOSING PACKAGE) FOR DR 1.0 EXPANSION PROJECT AT IOCL DIGBOI REFINERY DIGBOI ASSAM INDIA
2024_REFHQ_178114_1
TP/214227C/T/LSTK/PKG03
Open Tender
Mechanical Works
450 days
IOCL DIGBOI REFINERY ASSAM
AS PER NIT
6 documents required · 6 mandatory
₹13.7 L
Yes
ONLINE MS TEAMS
24 Jul 2025
11 Jun 2024
27 Aug 2024
11 Jun 2024
26 Aug 2024
2 Jul 2024
12 Jun 2024 - 19 Jun 2024
21 Jun 2024
Execution of complete Scope of Work on Lump Sum Turnkey Basis (LSTK) with single point responsibility. The scope of work shall include Project Management, Design, Detailed Engineering including participation during as mentioned in Bidding Documents, and co-ordination for the same with Owner/EPCM, Complete Procurement (including first fill of lubricants, chemicals, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares, replenishment of spares consumed during installation, pre-commissioning, commissioning and start-up activities & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Receipt, Handling & Storage of all Equipment, Materials, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil (excluding construction of foundation and basin) & Structural, Mechanical, Piping, Plant Safety, Electrical and Instrumentation including tie-ins, Testing, calibration, Painting, obtaining all Statutory Approvals as required, Pre-commissioning & Mechanical Completion of Cooling Tower Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, Chemicals, consumables (Lubricants) for 6 (six) months of operation, Contract closure activities , OWNER/PMC punch points clearance of the as per Bidding document and handing over of the facilities with Final and “As Built” drawing/documentation. Supply of spares with necessary support and services during Defect Liability Period and supply of Tool & Tackles, Consumables, Lubricants etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities. Induced draft Counter flow FRP Cooling Tower (excluding construction of RCC Cooling Water basin, channel, sump and pump station as per bidding document). No. of Cells : 2 nos ( 1 working+ 1 stand by) Capacity (Per Cell) : 2700 m3/h per cell
Paharpur Cooling Towers Limited (BID ID -1026505)
HAMON COOLING SYSTEMS PRIVATE LIMITED (BID ID -1024651)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid