| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LRejected-Finance GAUSHALA MARKET OPP BUS STADND NARNAUL 123001 | MAHENDRAGARH | HARYANA | 123001 | L1 | Rejected-Finance EMD REFUND ONLY | |
| 2 | L2₹14.3 L+₹26,973.05 (1.92%)Rejected-Finance | L2 | Rejected-Finance EMD REFUND ONLY |
Tender Value
₹13.6 L
EMD Value
₹28,000
Closing Date
20 Jan 2022, 5:00 pmClosed
Executive Engineer, Provl. Divn. PWD B and R NNL
Executive Engineer, Provl. Divn. PWD B and R NNL
RESTORATION OF ROAD FROM NARNAUL-MOHINDERGARH ROAD FROM KM. 14.35 TO 18.20 (SH-17) IN M.garh Distt. (ROAD ID 2594) (Damaged by Adani Gas Ltd. for Laying of PNG Pipeline)
2021_HRY_202302_1
Restoration of NNMD road (Rs. 13.55 lacs)
Open Tender
Civil Works - Roads
Item-rate/Agreement basic
180 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹28,000
Yes
16 Jul 2022
31 Dec 2021
21 Jan 2022
31 Dec 2021
20 Jan 2022
31 Dec 2021
Amount
Providing and laying 150mm thick of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications (HSR 17.15.3)
Providing, laying 75/150 WBM (G-II) 53 mm to 22.4 mm (75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (HSR 17.23.2)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications.
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (HSR 17.26.2)
Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) (HSR 17.30.2)
Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP (HSR 17.31.2)
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-1 O grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 (HSR 34.1.2)
Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (HSR 34.49)
M/s K.K. Construction Company
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .