Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.4 Cr
EMD Value
₹1.2 L
Closing Date
16 Nov 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CMO NAGAR PARISHAD DOOMARKACHHAR
CMO NAGAR PARISHAD DOOMARKACHHAR OFFICE
TENDER DOCUMENT FOR INTERCEPTION DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR DUMAR KACHHAR TOWN
2026_UAD_543071_1
NIT NO 1259 DATE 12.10.2026
Open Tender
Civil Works - Others
Lump-sum
365 days
NAGAR PARISHAD DOOMARKACHHAR
PLEASE REFER TENDER DOCUMENTS.
10 documents required · 10 mandatory
₹15,000
₹1.2 L
NAGAR PARISHAD DOOMARKACHHAR OFFICE
15 Oct 2026
15 Oct 2026
18 Nov 2026
15 Oct 2026
16 Nov 2026
15 Oct 2026
23 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Interception & Diversion of Nallahs with STP works Project of Dumar Kachhar town under SBM 2.0
1. Design, providing, construction, installation, commissioning of Sewage Treatment Plant (STP) of capacity 0.4 MLD
2. Construction /Strengthening of 1 NO. 230 m Long RCC Drain necessary work, as per approved drawing & design.
3. Construction of I & D Structure
4. Construction of Intermediate Sewage Pumping station with Pump house including Boundary, Approach road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and required associated works to complete the job in all respect capacity 0.4 MLD
5. Providing and Laying non-pressure (NP3) RCC socket & spigot pipes with rubber gasket joint including testing of joints. Dia 500mm length 190 m
6. Providing, laying, jointing & testing of socket & spigot centrifugally cast (Spun) Ductile Iron pressure pipes with inside cement mortar lining (class K-7) with suitable Rubber Gasket (Push on) joints as per IS:5382/85 including testing of joint. Dia 150 mm length 150 m
7. Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing material like mechanical connector or jointing pipes by heating to the ends of pipes with the help of Teflon coated electric mirror/ heater to the required temperature and then pressing the ends together against each other, to form a monolithic & leak proof joint by thermosetting process. It may be required to be done with Jacks/Hydraulic Jacks/ But fusion machine. (50mm & above fusion jointed & below 50mm mechanical jointed )dia 90 mm length 1000 m
8. R.C.C. Ground Service Reservoirs & Sumps capacity 10 KL
Supply, delivery at site with necessary packing, receiving, unloading, shifting, storing, installation, testing and commissioning of Horizontal Centrifugal Split Casing pumps with motor, CI casing and casing ring, SS 316 impeller, SS 410 Shaft and shaft sleeve, coupling guard, common base plate, foundation bolts etc. complete with all respect as per the specification.
9. For laying the pipeline existing surface/roads structure shall be dismantled in appropriate width. The dismantling of various layers of roads shall be carried out as per requirement but within the particular item given in Schedule of rates. The pipe shall be laid over the approved bedding and in true levels as per specifications.
10. Substation, HT/LT Feeder 1.0 KM HT Feeder
11. Plantation and Landscaping OF STP Compus & both side of I&D nalla
12. Installation of Online Continuous Monitoring System (OCMS | 1 | LumpSum | 2,37,88,000 | ₹2,37,88,000 |
| 1.02 | Operation and Maintenance Cost For 1st Years | 1 | LumpSum | 9,80,000 | ₹9,80,000 |
| 1.03 | Operation and Maintenance Cost For 2nd Years | 1 | LumpSum | - | - |
| 1.04 | Operation and Maintenance Cost For 3rd Years | 1 | LumpSum | - | - |
| 1.05 | Operation and Maintenance Cost For 4th Years | 1 | LumpSum | - | - |
| 1.06 | Operation and Maintenance Cost For 5th Years | 1 | LumpSum | - | - |
| 1.07 | Operation and Maintenance Cost For 6th Years | 1 | LumpSum | - | - |
| 1.08 | Operation and Maintenance Cost For 7th Years | 1 | LumpSum | - | - |
| 1.09 | Operation and Maintenance Cost For 8th Years | 1 | LumpSum | - | - |
| 1.1 | Operation and Maintenance Cost For 9th Years | 1 | LumpSum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
NIT1259.pdf
Tender Documents • 1.97 MB
FinaldprLWMdumarkachharDPR.pdf
Other Document • 14.92 MB
BOQ_653131.xls
BOQ • 0.35 MB
AnnexureE.pdf
Additional Documents • 2.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .