Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹33.3 LAccepted-AOC | ₹33.3 L Quoted ₹28.2 L | L-1 | Accepted-AOC As being Techno commercially L-1 |
| 2 | L-2₹36.5 LRejected-Finance AT BAGHAMARA PO GHANTAPADA DIST ANGUL ODISHA PIN 759103 | ANGUL | ANGUL | ODISHA | 759103 | ₹36.5 L | L-2 | Rejected-Finance As not being Techno - Commercially L-1 |
| Sl No | Description | Qty | Unit | Amarjit Kumar L2 | M/s. SHAKTI ASSOCIATE L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.10 | Cleaning of debries at galleries in the underground by manual labour including stacking of serviciable materials and unservicible materials with a lead upto 30 mtr. And lift upto 1.5 mtrs. | 533.23 | Cum. | 785 ₹4.2 L | 607.39 ₹3.2 L |
| 2.00 | Excavation in coal/shale by chiselling in trenches & drains for making notches in gallery including stacking of sreviceable materials & un-serviceable materials with a lead upto 30 mtr & lift upto 1.50 mtr. The roof, floor and sides to be neatly dressed. (Notching in the floor, width=0.20 - 0.70 mtr., depth=0.10 to 0.70 mtr. | 182 | Cum. | 2,822 ₹5.1 L | 2,182.82 ₹4.0 L |
| 3.00 | Providing and laying in position cement of specified grade excluding the cost of centring and shuttering - all work up to plinth level : 1:2: 4 (1cement : 2 coarse sand : 4 graded ston aggregate 20 mm nominal size). | 129.6 | Cum. | 9,130 ₹11.8 L | 7,061.13 ₹9.2 L |
| 4.00 | Providing & laying in position specified of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work up to plinth level. 1:1.5:3 [1 Cement : 1.5 Coarse sand : 3 graded stone aggregate 20mm nominal size] CODE 5.1.2 BASED ON MCL SOR 2024. | 27.75 | Cum. | 11,466 ₹3.2 L | 8,867.45 ₹2.5 L |
| 5.00 | cost of TOR Steel 16mm/12mm/ 8mm, based on GM'S SOR-99, SL No. - 6 | 2,058.65 | Kg | 123 ₹2.5 L | 95.73 ₹2.0 L |
| 6.00 | Centring of shuttering including strutting propping etc. and removal of from work, code 5.9.1, Based on MCL SOR 2024. | 285 | Sq.m | 465 ₹1.3 L | 359.67 ₹1.0 L |
| 7.00 | Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources). Based on code 4.5.1 of MCL's SOR 2024 | 10 | Cum. | 14,859 ₹1.5 L | 11,439.65 ₹1.1 L |
| 8.10 | Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) a) Stone Aggregate | 24.08 | Cum. | 1,806 ₹43,488.48 | 1,397.01 ₹33,640 |
| 8.20 | Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) b) Sand | 12.04 | Cum. | 1,806 ₹21,744.24 | 1,397.01 ₹16,820 |
Updated dates
Tender Value
₹38.4 L
EMD Value
₹48,100
Closing Date
25 Nov 2025, 5:00 pmClosed
Staff Officer(Mining), Talcher Area
The Office of Staff Officer(Mining), Talcher Area.
Construction of pathway along travelling roadway at Nandira Colliery, Talcher Area.
2025_MCL_347262_1
SO(M)/e-Tender/25-26/06 DTD. 12.11.2025
Open Tender
Civil Works - Others
30 days
Nandira Colliery
As per NIT
3 documents required · 3 mandatory
₹48,100
12 Jan 2026
12 Nov 2025
28 Nov 2025
12 Nov 2025
25 Nov 2025
12 Nov 2025
12 Nov 2025 - 17 Nov 2025
Amount
Item Description/ Heading
Cleaning of debries at galleries in the underground by manual labour including stacking of serviciable materials and unservicible materials with a lead upto 30 mtr. And lift upto 1.5 mtrs.
Excavation in coal/shale by chiselling in trenches & drains for making notches in gallery including stacking of sreviceable materials & un-serviceable materials with a lead upto 30 mtr & lift upto 1.50 mtr. The roof, floor and sides to be neatly dressed. (Notching in the floor, width=0.20 - 0.70 mtr., depth=0.10 to 0.70 mtr.
Providing and laying in position cement of specified grade excluding the cost of centring and shuttering - all work up to plinth level : 1:2: 4 (1cement : 2 coarse sand : 4 graded ston aggregate 20 mm nominal size).
Providing & laying in position specified of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work up to plinth level. 1:1.5:3 [1 Cement : 1.5 Coarse sand : 3 graded stone aggregate 20mm nominal size] CODE 5.1.2 BASED ON MCL SOR 2024.
cost of TOR Steel 16mm/12mm/ 8mm, based on GM'S SOR-99, SL No. - 6
Centring of shuttering including strutting propping etc. and removal of from work, code 5.9.1, Based on MCL SOR 2024.
Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources). Based on code 4.5.1 of MCL's SOR 2024
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) a) Stone Aggregate
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) b) Sand
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) c) Cement
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) d) Stone Aggregate
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) e) Sand
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) f) Cement
Transportation of material ( Surface to underground through haulage thereafter pushing trolley & carrying manual for a lead of 800 m.) d) Steel
Total impact of GST for the purpose of CTC
Amarjit Kumar (BID ID -1197347)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.31 MB
Tendernotice_2.pdf
PDF • 1.19 MB
BOQ_359964.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid