| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹23.9 CrAccepted-AOC MOHANTAPARA P O DIST JALPAIGURI W B PIN 735101 | JALPAIGURI | JALPAIGURI | WEST BENGAL | 735101 | L 1 | Accepted-AOC Accepted | |
| 2 | L 2₹24.4 Cr+₹51.1 L (2.14%)Rejected-Finance 6 BIPLABI DINESH MAJUMDAR SARANI 1ST FLOOR FLAT 1B NEW ALIPORE KOLKATA 700053 | KOLKATA | DHALAI | TRIPURA | 700053 | L 2 | Rejected-Finance Rejected, higher bid value | |
| 3 | L 3₹25.1 Cr+₹1.2 Cr (4.99%)Rejected-Finance KREENG SUDIN SHOP NO GH GROUND FLOOR B B ROY LANE COOK S COMPOUND PURULIA PIN 723102 | PURULIA | PURULIA | WEST BENGAL | 723102 | L 3 | Rejected-Finance Rejected, higher bid value | |
| 4 | L 4₹25.1 Cr+₹1.2 Cr (5.00%)Rejected-Finance 139 3 A PO KHAGRA DIST MURSHIDABAD PIN 742103 | KHAGRA | MURSHIDABAD | WEST BENGAL | 742103 | L 4 | Rejected-Finance Rejected, higher bid value |
Tender Value
₹22.8 Cr
EMD Value
₹10 L
Closing Date
17 Feb 2023, 3:00 pmClosed
SE NBHC
SE NBHC SAKTIGARH SILIGURI
Dhupguri to Nathua Road from 1.00 KMP to 18.00 KMP, Strengthening work under Jalpaiguri Highway Division, in the district of Jalpaiguri under RIDF XXVIII
2023_SH_454048_1
WBPW(R)/SE/NBHC/NIT19e/2022-23
Open Tender
CIVIL WORKS
Percentage
365 days
Jalpaiguri Dhupguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹10 L
Yes
OFFICE OF SE NBHC
22 Nov 2025
21 Jan 2023
20 Feb 2023
23 Jan 2023
17 Nov 2025
24 Jan 2023
24 Jan 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART : A ROAD WORK
Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works)
Land arranged by the Contractor (Rate are included with Royalty & cess)
Carriage of all kinds of earth by Mechanical Transport:
Carriage up to total lead of 3.0 km (with initial lead upto 1.00 km) | 11,135.2 | M3 | 251.8 | ₹28,03,843.36 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works) | 4,300.8 | M3 | 85.6 | ₹3,68,148.48 |
| 3 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
By mechanical means (with milling machine) :
From 50 mm to 100 mm thick. | 93,324 | M2 | 7.5 | ₹6,99,930 |
| 6 | Wet Mix Macadam Base Course
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and
granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental
costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of
Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Using PAKUR variety Stone Chips
26.50 mm size chips @ 0.3960 m3/m3
13.20 mm size chips @ 0.2640 m3/m3
5.60 mm size chips @ 0.3564 m3/m3
Stone dust mixed with grit @ 0.3036 m3/m3 | 21,132.87 | M3 | 2,610.4 | ₹5,51,65,243.85 |
| 7 | Granular Sub-base with Graded Material (Table:- 400-1)
Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and
camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of
all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).
Grading – III
Using PAKUR variety stone chips
26.50 mm size chips @ 0.4480 m3/m3
5.60 mm size chips @ 0.5760 m3/m3
Medium sand @ 0.2560 m3/m3 | 1,234.2 | M3 | 2,313.67 | ₹28,55,531.51 |
| 7.01 | Grading – V
Using PAKUR variety stone chips
37.50 mm size chips @ 0.2560 m3/m3
22.40 mm size chips @ 0.2560 m3/m3
11.20 mm size chips @ 0.1920 m3/m3
5.60 mm size chips @ 0.3200 m3/m3
Medium Sand @ 0.2560 m3/m3 | 652.67 | M3 | 2,383.64 | ₹15,55,730.32 |
| 8 | 灰祬湩Ⱨ猠牰慥楤杮愠摮挠浯慰瑣湩慓摮琠敲畱物摥琠楨正敮獳湩氠祡牥潮⁴硥散摥湩㔱‰浭琠牰灯牥朠慲楤湥⁴湡慣扭牥湩湵慤楴杮攠捡慬敹祢眠瑡牥愠摮瀠捡楫杮愠摮爠浡業杮氠祡牥戠⁹慬敹潴愠档敩敶搠獥物摥挠浯慰瑣潩Ɱ椠据畬楤杮氠杩瑨湩Ⱨ朠慵摲湩Ⱨ戠牡楲慣楤杮愠摮洠歡湩摡煥慵整攠牡桴湥戠湵桤眠敨敲渠捥獥慳祲畣楲杮眠瑩慷整獡瀠牥搠物捥楴湯敭摮湩牣捡獫愠摮搠灥敲獳潩獮戠⁹慲浭湩桷牥癥牥渠捥獥慳祲ȭ̈倀 | 138.88 | M3 | 828.17 | ₹1,15,016.25 |
| 9 | Prime Coat
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For WBM / WMM Surface:
Using Bitumen emulsion (SS 1 TYPE) (Bulk) @ 0.85 KG /m2 | 83,028 | M2 | 30.91 | ₹25,66,395.48 |
| 10 | Tack Coat
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) On Granular surfaces treated with primer
Using Bitumnen emulsion (RS - 1 TYPE) (Bulk) @ 0.275 KG / m2 | 83,028 | M2 | 9.57 | ₹7,94,577.96 |
| 10.01 | (ii) On Bituminious surfaces
Using Bitumnen emulsion (RS - 1 TYPE) (Bulk) @ 0.25 KG / m2 | 83,028 | M2 | 8.82 | ₹7,32,306.96 |
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_907329.xls
BOQ Document • 0.39 MB
113162745.html
Tender Document • 0.03 MB
113272737.pdf
Tender Document • 0.41 MB
2911new.pdf
Tender Document • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .