Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.2 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹2.8 L+₹3,619 (0.49%)Accepted-AOC | L-2 | Accepted-AOC As per site requirement | |
| 3 | Rejected-Technical 2 III 7 OBRA COLONY OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | - | Rejected-Technical As Per PQC |
Tender Value
₹7.1 L
EMD Value
₹14,200
Closing Date
30 Oct 2020, 6:00 pmClosed
Superintending Engineer -II 3x200MW BTPS Obra
Office of the SE-II,3x200MW, BTPS Obra, Sonebhadra,Uttar Pradesh - 231219
Break down / Routine maintenance of Main Turbine, Control valves, CVSM, and other associated equipments of TMD, for Unit No. 9th, 10th, 11th 12th and 13th of 200MW Units, BTPS, Obra.
2020_RVUNL_516388_1
T-12/SE-II/ 3X200MW/BTPS/TMD-I/2020-21
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Unit no.9, 10, 11, 12 and 13 of 5x200MW BTPS OBRA
As per PQC
3 documents required · 3 mandatory
₹590
Deputy Chief Accounts Officer CFA and BO BTPS OBRA
₹14,200
6 Jan 2021
30 Sept 2020
6 Nov 2020
30 Sept 2020
30 Oct 2020
30 Sept 2020
30 Sept 2020 - 30 Oct 2020
Amount
Changing of Gasket of E.S.V.
Changing the Transfer pipe Gasket of IPC Flange.
Changing of Transfer Pipe Gasket of HPC Flange.
Complete O/H/Changing of Control valve of HPC & IPC.
Complete Overhauling of Barring Gear.
Removing of Bearing Gear from TVS Position for Different Expansion Instrument works:-
Replacement of Defective oil seal/Bearing of worm of Barring gear.
Replacement of Defective Pinion Brg. of worm wheel shaft etc. of Barring gear:-
To Open Top cover of T.G. Bearing for Instrument Work/ to attend the oil leakage from parting plane.
Bearing No-1
Bearing No-2
Bearing No-3
Bearing No-4
Overhauling of Main Ejector/Attending Tube Leakage of Main Ejector.
Changing of Barring of roller of Control valve. Of HPC
Changing of Thrust Bearing/Gear Coupling of MOP
Inspection/Rectification of fault of Turbine bearing:-
Bearing No.-1
Bearing No.-2
Bearing No.-3
Bearing No.-4
Bearing No.-5
Bearing No.-6
Bearing No.-7
Overhauling of Pilot valve of servo motor of ESV/I.V.
Changing of bush in control valve.
Re-visioning of Cam shaft of:-
Cam shaft of HPC.
Cam shaft of IPC.
Re-visioning of Control Valve Column of :-
Replacement of LPC Diaphragm.
Changing of Thrust Pads of working /Non working side of bearing No. 2 of Turbine.
Complete Overhauling of CVSM.
Complete Overhauling of Servomotor of E.S.V/I.V.
Re-visioning of E.G.P.V.
Re-visioning of other Pilot Valves.
Cleaning & Checking of tube leakage of Oil Cooler of Main Turbine.
Cleaning of filters of main oil tank.
Alignment of motor of barring gear.
O/H of feed back pilot valve of CVSM.
Cleaning of Condenser (2 Block in each unit).
Checking of tube leakage of Condenser (2 block in Unit).
M/S ADITIYA VISHWAKARMA CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .