| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹934.6 CrAccepted-Finance A 32 SITE IV INDUSTRIAL AREA SAHIBABAD GHAZIABAD UTTAR PRADESH 201010 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201010 | ₹934.6 Cr | L1 | Accepted-Finance L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Bidder is Not meeting financial Bidder Qualification Criteria |
| Sl No | Description | Qty | Unit | HAL OFFSHORE LIMITED L1 |
|---|---|---|---|---|
| 1.00SP-0: LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, updation of FEED Package, Detailed Design and Engineering, 3D Modelling, Hazop, preparation and submission of engineering drawings & related documentation including As-built/ Final documentation providing all services and completing the work in all respects as per provision of Bidding Document. Supply of all materials including - procurement services, shop fabrication, inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc., supply of start-up / pre-commissioning / commissioning / mandatory spares, chemicals / lubricants (Except Owner supplied chemicals) for first fill as per tech. specifications. Construction / Erection including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, erection, installation, testing, Inspection, pre-commissioning / commissioning & PGTR, training to Owner personals, handing over to owner including all disciplines of work and supply of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. • Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional. | ||||
| 2.00SP-1: ( Supply portion):Lumpsum price for supply portion for completion of scope of work as per bidding document wich includes following but not limited to: Procurement, supply, Inspection, Transportation,Port handling, Shop fabrication, Assembly, Testing of all items, equipment’s, Components, Materials, bought out items, Procurement of raw materials and sub-ordered equipment, shop fabrication/assembly, inspection, testing, supply of all commissioning assistance and mandatory spares, consumables, chemicals/ lubricants, (Except Owner supplied Chemicals) for first-fill as per techical specificaiton, special tools and tackles , receipt, accounting, storing & preservation of materials as required for work as per Bidding Document requirements for EPC package | ||||
| 2.10 | SP-01B: FOREIGN CURRENCY PART Total Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document (except Custom Duty, SWS, and IGST/CGST& SGST and its related cess if any.) | 1 | LS | - |
| 2.20 | SP-01A: INDIAN CURRENCY PART Total Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document (except IGST/CGST& SGST) | 1 | LS | 5,13,90,00,000 ₹606.4 Cr |
| 3.00SP-2: ( Services portion ): | ||||
| 3.10Lumpsum price for Design & Detailed Engineering price for completion of scope of work as per bidding document witch includes following but not limited to: RESIDUAL PROCESS DESIGN , DETAILED ENGINEERING preparation of Datasheets, P&IDs, PFDs, specifications for procurement, GAD, & Layouts, 3D Model, Safety studies, Hazop, engineering fabrication drawings, Procurement & Construction schemes, Control Logics, Cause & Effect diagrams, Electrical System studies, Statutory approval from various Statutory state & central Government bodies, approval of drawings &documents from OWNER/EIL, submission of Final Technical documents, AS BUILT Documents and 3D Model, Pre-commissioning, Commissioning and Operating manuals for all units including packages as per Bidding Document requirements. | ||||
| 3.20 | FOREIGN CURRENCY PART Total Lumpsum Price (except IGST/CGST& SGST and its related cess, if any) | 1 | LS | - |
| 3.30 | INDIAN CURRENCY PART Total Lumpsum Price (except IGST/CGST& SGST and its related cess, if any) | 1 | LS | 39,60,00,000 ₹46.7 Cr |
| 3.40Lumpsum price for construction as per requirement detailed out in various section of bidding document witch includes following but not limited to: Construction, installation completion of work in all respects for LSTK Package including required resources, Cranes, Scaffolding, temporary barricading, Transportation and site handling of material/equipments, supply of consumables, tools and tackles, field engineering services, Receipt, storage, conservation, preservation of FIM and contractor supplied items etc. Fabrication, construction, assembly, erection at site for all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit, refractory, insulation, coating, painting, testing, etc. providing all temporary works/structures and equipment for completion, obtaining statutory approvals, pre-commissioning, commissioning , performance guarantee test runs, Training to owner personals, completing all the work in all respects to make system smooth, operable and handing over as per Bidding Document requirements and instructions of the Engineer In Charge. | ||||
| 3.50 | FOREIGN CURRENCY PART Total Lumpsum Price (except IGST/CGST& SGST and its related cess, if any) | 1 | LS | - |
Updated dates
Tender Value
Refer Docs
EMD Value
₹2.2 Cr
Closing Date
6 Nov 2025, 12:00 pmClosed
Mr. L. Thavurya, GM (SCM)
EIL GURUGRAM
COKE DRUM REPLACEMENT, ALLIED MODERNIZATION AND PIPING WORKS IN DELAYED COKER UNIT OF PANIPAT REFINERY AT IOCL, PANIPAT
2025_REFHQ_185704_1
LT/B885-078-PM-T-9801/1001
Open Tender
Lump Sum TurnKey
900 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
7 documents required · 7 mandatory
₹2.2 Cr
Yes
AS PER TENDER DOCUMENT
2 May 2026
4 Jul 2025
7 Nov 2025
4 Jul 2025
6 Nov 2025
1 Aug 2025
4 Jul 2025 - 4 Aug 2025
6 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 32.99 MB
Download all tender documents and submit your bid