Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -31.60% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹914.10 (0.36%)Admitted-Finance NA | -31.36% | ₹2.6 L+₹914.10 (0.36%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹9,633.51 (3.77%)Admitted-Finance | -29.02% | ₹2.6 L+₹9,633.51 (3.77%) | L3 | Admitted-Finance |
Tender Value
₹3.7 L
EMD Value
₹7,460
Closing Date
12 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
OFFICE OF EXECUTIVE ENGINEER REW JAMMU
Constuction of Passenger shed near bus stand kahrah pyt kharah Block Kharah Balli under cdf (Sh. Satish Sharma )for the year 2026-27 (2nd Call)
2026_RDPR_323213_9
e-NIT No. 523-REWJ of 2026-27 dated 03-09-2026
Open Tender
Civil Works - Others
Item Rate
JAMMU
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹7,460
18 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
12 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 13.45 | cum. | 2,516.85 | ₹33,851.63 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 0.84 | cum. | 1,458.45 | ₹1,225.1 |
| 3 | EXCAVATING SUPPLYING AND FILLING OF LOCAL EARTH INCLUDING ROYALITY COMPLETE | 9.77 | cum. | 276.6 | ₹2,702.38 |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundation, drains, pipes cables etc. (not exceeding 1.5m in width) and for shafts wells , cesspits and the likenot exceeding10sqm on plan,including dressing of sides and ramming of bottom lift upto 1.5m , including getting out excavated earth and disposal of surplus excavated earth as directed with in lead 50mtrs neatly dressed in A.K.O.S. | 4.59 | cum. | 256.85 | ₹1,178.94 |
| 5 | P/L in position Cement conc. 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.42 | cum. | 4,826.5 | ₹6,853.63 |
| 6 | P/L in position Cement conc. 1:1.5:3 mix for RCC Work using 20 mm N/Size Agg. For Column/Beams/Slab excluding the cost of centring & shuttering all work upto plinth level. | 2.95 | cum. | 7,788.4 | ₹22,975.78 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.04 | cum. | 5,877.6 | ₹6,112.7 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.88 | cum. | 9,395.7 | ₹55,246.72 |
| 9 | Steel reinforcement for RCC work including straightening,cutting, bending and placeing in all position with complete binding. | 794.86 | KG | 123.2 | ₹97,926.75 |
| 10 | Centring & shuttering including strutting, propping etc. and removal of the formwork. Columns, pillars, piers, abutments, posts and struts. | 20.07 | sqm. | 742.55 | ₹14,902.98 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_1087390.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .