Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | -33.01% | ₹7.0 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 L+₹78,259.59 (11.2%)Admitted-Finance | -25.50% | ₹7.8 L+₹78,259.59 (11.2%) | L2 | Admitted-Finance |
| 3 | L3₹9.0 L+₹2.1 L (29.5%)Admitted-Finance | -13.24% | ₹9.0 L+₹2.1 L (29.5%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.4 L
EMD Value
₹20,840
Closing Date
23 Jul 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD RnB Division Marwah
CONSTRUCTION OF RESOUCRE ROOM AT SHAHEED SG CONSTABLE JODH RAM HIGH SCHOOL CHANJER MARWAH
2026_PWDJK_316424_1
e-NIT No.12 of 2026-27 dated 16-07-2026
Open Tender
Civil Works
Percentage
90 days
Marwah
CONSTRUCTION OF RESOUCRE ROOM AT SHAHEED SG CONSTABLE JODH RAM HIGH SCHOOL CHANJER MARWAH
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Marwah
₹20,840
Executive Engineer PWD RnB Division Marwah
27 Jul 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from
cutting edge All kind of soil | 23.34 | Cum | 479.3 | ₹11,186.86 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 4.75 | Cum | 4,826.5 | ₹22,925.88 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.53 | Cum | 7,788.4 | ₹27,493.05 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.67 | Cum | 9,395.7 | ₹15,690.82 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 546.21 | Kg | 123.2 | ₹67,293.07 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 7.39 | Cum | 218.4 | ₹1,613.98 |
| 7Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 7.01 | Foundations, footings, bases for columns | 84.31 | Sqm | 286.35 | ₹24,142.17 |
| 7.02 | Lintel, beams, plinth beams, girders, bressumers and cantilevers | 13.8 | Sqm | 577.55 | ₹7,970.19 |
| 7.03 | Columns, pillars, piers, abutments, posts and struts. | 4.46 | Sqm | 742.55 | ₹3,311.77 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_1031534.xls
BOQ • 0.28 MB
corrigendum.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .