| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance | ₹9.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-incomplete/wrong affidavit |
Tender Value
₹9.9 L
EMD Value
₹99,149
Closing Date
19 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Improvement of Road and Drain by C.C from h/o Anand to H/O vipin at R.K. Puram in ward62 Zone02
2026_NNKAN_1159085_1
400/AA-2/25-26
Open Tender
Civil Works
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,149
2 Jul 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W cutting and Filling or ion embankment in ordinary soil exavation to be done pits not exciding 1.5 including all completion of work | 492 | cum | 125 | ₹61,500 |
| 2 | Construction of granular Sub base (GSB) etc all complete. | 1 | cum | 3,671 | ₹3,671 |
| 3 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 24.6 | cum | 170 | ₹4,182 |
| 4 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | 6.15 | cum | 4,380 | ₹26,937 |
| 5 | 12mm Thick Cement plaster1;4 in single coat on Both side of single or half brick wall for interior plasting upto flor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80mm in girth and finishing even and smooth. | 106.6 | sqm | 200 | ₹21,320 |
| 6 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work. | 0.8 | cum | 6,600 | ₹5,280 |
| 8 | Construction of gullypit 0.60x0.60x0.75 as per KNN design etc all work | - | cum | 5,180 | - |
| 9 | Providing and Laying 125 micron polythen sheet including all labour work. | 410 | sqm | 18 | ₹7,380 |
| 10 | Providing and Laying Pre Moulded joints filler 12mm thick for expention including all labour work | - | sqm | 320 | - |
| 11 | Provinding and laying desing mix cement Concrete of M-30 grade, in roads/ Taxi tracks/ runways,using Cement Contest as per design mix, using coarse sand and graded stone aggreate of 40mm nominal size in appropriate proportions as per approved and Specified design criteria providing dowel bars with Sleeve/ tie bars wherever required, laying at dite, spreading and compacting mechanically by using needle and surface vibrators, lavelling to required slope/ Camber, finishing with requied texture, including texture, including steel from work with sturdy M.S.Channel sections.curing. making provision for contraction/ expansion, construction and longitudinal joints (10mm widex 50mm deep) by groove cutting machine, providing and filling joints with approved joints filler adn sealants, complete all as per direction of Engineering charge(items of joints fillers sealants dowel bars with sleeve/ tie bars to complete the work. | - | cum | 8,538.55 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.65 MB
BOQ_2172308.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid