Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -23.51% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹23,518.80 (16.4%)Admitted-Fee/PreQual/Technical/Finance | -11.00% | ₹1.7 L+₹23,518.80 (16.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹5,640
Closing Date
17 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O FOOTPATH AND RWALL NHO REYAZ KHAN ,SHERAJ AND GAFOOR KHAN AT KHANDEJI KHANPORA BLOCK SHANGUS
2026_RDPR_320097_49
ENIT88of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹5,640
21 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearence including preparation of subgrade by engaging JCB | - | hrs | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:(All kinds of soil ) | - | Cum | - | - |
| 0.0 | P/L of Khak Bajri/RBM/stone soling incl. levelling, watering, all carriages (loading/unloading) from source upto site of work complete | 1 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excl. the cost of centring and shuttering. all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) all complete | 1 | Cum | - | - |
| 0.0 | Centering and shuttering incl. strutting propping etc including removal of formwork, all carriages complete (Foundations, footings, bases of columns etc. for mass concrete) | 1 | Sqm | - | - |
| 0.0 | Carriage of sand/Stone agg. 20 mm size from at an avg. lead of 20 Km | - | Cum | 1 | - |
| 0.0 | Add for sign board and Photographs, & other unforeseen item | - | NO. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1063141.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .