| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹7.1 L+₹62,429.82 (9.61%)Rejected-Finance VILLAGE BADASH P O AG SHIMLA TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹7.1 L+₹65,042.77 (10.0%)Rejected-Finance LOWER DEVNAGAR VIKASNAGAR SHIMLA 09 | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Pradeep Singh L1 | Vinod Kumar Shah L2 | Bhaw Singh Chauhan L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock | 24.3 | P.Cum | 500 ₹12,150 Lowest | 600 ₹14,580 | 600 ₹14,580 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | 8.1 | P.cum | 5,200 ₹42,120 Lowest | 6,000 ₹48,600 | 5,500 ₹44,550 |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 144.9 | P.Sqm | 500 ₹72,450 Lowest | 600 ₹86,940 | 600 ₹86,940 |
| 3.10 | Suspended floors,roofs,landings, balconiesand access platform | 3.6 | P.Sqm | 550 ₹1,980 Lowest | 600 ₹2,160 | 650 ₹2,340 |
| 4.00 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size) | 13.5 | P.cum | 7,800 ₹1,05,300 Lowest | 8,500 ₹1,14,750 | 8,200 ₹1,10,700 |
| 5.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:1½:3 (1 cement : 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 17.3 | P.Cum | 7,800 ₹1,34,940 Lowest | 8,500 ₹1,47,050 | 8,500 ₹1,47,050 |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 0.54 | P.Cum | 7,800 ₹4,212 Lowest | 8,500 ₹4,590 | 8,500 ₹4,590 |
| 7.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 73.32 | P.Kg | 108 ₹7,918.56 Lowest | 110 ₹8,065.2 | 110 ₹8,065.2 |
| 8.00 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture | 12 | P.Sqm | 100 ₹1,200 Lowest | 100 ₹1,200 Lowest | 110 ₹1,320 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars | 2,082.59 | P.kg | 98 ₹2,04,093.82 Lowest | 100 ₹2,08,259 | 105 ₹2,18,671.95 |
Tender Value
₹6.0 L
EMD Value
₹12,100
Closing Date
14 Jul 2025, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Repair of nallah from Mamta Niwas to Path crossing below Harish Niwas in Devnagar ward No 29 Vikasnagar SH Repair of 40 mtr channel at Devnagar
2025_MC_109513_6
1442dated01072025
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer tender documents
7 documents required · 7 mandatory
₹590
Executive Engineer R B M C Shimla
₹12,100
5 Sept 2025
5 Jul 2025
15 Jul 2025
5 Jul 2025
14 Jul 2025
5 Jul 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Suspended floors,roofs,landings, balconiesand access platform
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:1½:3 (1 cement : 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
15 mm cement plaster in single coat on Rough side of brick/Concrete /stone walls for interior plastering up to all floor level including arises internal rounded angles chamfers and or rounded angles not exceeding 80 mm in grith and finished even and smooth in cement motar 1:6 (1 cement : 6 Sand)
Vinod Kumar Shah (BID ID -534530)
Bhaw Singh Chauhan (BID ID -534684)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .